An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Road Maintenance Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP)

  2. Three Enemies of Roads • Water – rain • Water – groundwater • Water – surface runoff, streams Streams must be managed to safely cross roads (culverts, fords, bridges, etc.)

  3. Types of Roads • Cultural: for foot and animal traffic • Intermediate means of transport (IMT): unpaved roads for low numbers of vehicles • High tech: paved roads

  4. Negative Aspects of Improved Roads • Increased accidents as vehicles travel faster • Accidents involving pedestrians and animals • Accidents caused by poor human judgment (drivers and pedestrians), not roads • Ethiopia has 2nd highest rate of road accidents per vehicle I the world

  5. Causes of Accidents • Behavior of drivers, pedestrians, and animals • Condition of vehicles • Road conditions • Lack of enforcement of driving regulations

  6. Maintenance Purposes and Causes of Road Deterioration It prolongs the road life and postpones the day when renewal is required. It reduces the cost of operating vehicles and intermediate means of transport (IMT) It helps to keep roads open and enables greater regularity, punctuality and safety of road transport services.

  7. The money and efforts of the community spent on the construction of roads, tracks and footpaths areoften wasted because of: • Insufficient funds for maintenance • Shortage of skilled and experienced staff • Poor allocation of available resources • Inadequate management

  8. Road Funding • Insuffieient funding for roads at federal, regional, municipal, and woreda levels • Source of funds • Road fund administration • Fuel levies going to road fund. Approximately 7% of fuel cost) • Poor allocation of road funds • Federal roads (65-75%), regional roads (20-25%), municipalities (7-10%), woredas (0%)

  9. Shortage of Skilled and Experienced Staff • This is why we are here • Shortages exist at all levels • Turnover of skilled and experienced staff high because leave for private sector (consulting firms)

  10. Poor Use of Available Resources • We do not do sufficient research & evaluation on road construction and maintenance to identify & implement improved construction and maintenance methods • Resources for road construction/maintenance (4Ms) • Manpower • Money • Machinery and equipment • Materials

  11. Inadequate Management • Lack of planning • Poor allocation of resources • Poor training of managers • Lack of accountability for managers • Poor management hierarchy • Effective management requires: • Good planning • Good implementation • Reporting of results

  12. Main Causes of Road Deterioration lack of timely maintenance dumping of loads on road overloading • rainfall • steep gradients • flat gradients • traffic • poor construction • vegetation

  13. Overloading

  14. ILO LBRC Video Maintenance

  15. Questions or comments from trainees or other trainers?

  16. Training of Trainer Personnel on Environmentally Sound Design andImplementation of Public Works-Community Roads of the ProductiveSafety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessé, Ethiopia