490 likes | 1.47k Views
Introduction to BizAgi. User Interface (Summary). The user interface for BizAgi resembles Office It uses a similar ribbon The Palette contains the various symbols (Flow, Artifacts, Swimlanes , Connections) Draw these on the visual palette
E N D
User Interface (Summary) • The user interface for BizAgi resembles Office • It uses a similar ribbon • The Palette contains the various symbols (Flow, Artifacts, Swimlanes, Connections) • Draw these on the visual palette • The Elementproperties section allows you to configure the selected element
Creating a New Model • Click File, New to create a new BizAgi model • The design surface shows a process with a single pool • Use the Basic properties to give the process a name • Drag the Laneicon to the design surface to create a swim lane • Use the element properties to name each swim lane
Creating the Model • Use the Palette to drag symbols to the diagram
Events • Fire as a result of something happening • A message is received • A period of time elapses • An exceptional conditional arises • We typically perform an action in response to an event
Events • Fire as a result of something happening • A message is received • A period of time elapses • An exceptional conditional arises • We typically perform an action in response to an event
Event Types • Message – Arrives from a participant • Timer – Process starts at a period in time • Rule (conditional)– Triggers when a rule becomes true
Event Types (2) • Link – Connect the end event of one process to the start of another process • Multiple – Multiple ways of triggering the process • Exception – An error • End events
Message Events • Messages are typically sent by one participant and received by another • Send sales order information that is received by accounting to check credit • The event can be thrown or caught • Sending a message means throwing a message • Receiving a message means catching a message • See MessageThrowCatch in EventSamples
Timer Events • The event fires a specific time or cycle • Only applicable to start or intermediate events • In BizAgi, use the Element properties to set the timer to a date or cycle • Examples • Time delay to approve credit • Wait for payment date • Start payroll process every two weeks • See Timer in EventSamples
Conditional Events • Events that fire when an external condition becomes true or false • Process A/P checks on Mondays • We could also implement this as a timer • Inventory below threshold – generate order request • Only applicable to start or intermediate events • See Conditional in EventSamples
To Create an Event • First, drag the event icon to the designer surface • Right-click on the event and set the event type
Gateways 1 • Gateways are used to depict decisions or merges • Types • Exclusive (XOR) • Only one output (alternative) flow is allowed • Gateways diverge or converge • Inclusive (OR) • A default output flow must be specified • Parallel for / join (AND)
Gateways (2) • Event-based gateways • These are (Exclusive) gateways that rely on external messages
Gateway – XOR Example • Exclusive XOR Decision • See ExclusiveGatewayin EventSamples
Gateway - OR • Inclusive OR decision
Gateway – Example 3 • Parallel Forking – All sequence flows drawn out of the gateway are taken
Processes and Tasks • A process is a network of steps • A process can be marked as having a sub-process • To mark an activity has having a sub process, right-click the activity and click Transform to subprocess
Data Objects • First, we are not talking about a database or physical data • We are talking about information about a process • Data objects are attached to a sequence or message flow with a dashed line
Text Annotation • Contains descriptive text about a process • A line connects the annotation to the activity
Workflow Patterns (Introduction) • In this second section of the lecture, we talk about simple and complex workflow patterns • Much of this is derived from the AIFB paper (Modeling Workflow Patterns) in this lecture
Sequence Pattern • Tasks are executed in sequence (one after another)
Parallel Split • This is a logical AND gateway • The parallel branches are executed concurrently
Synchronization • Two or more different branches get merged into a single branch • All merged branches must be completed before the process can continue (Implied) • Synchronization can occur because of a parallel split
Exclusive Choice • Here, we are making a decision with mutually exclusive outcomes • (Only one outcome is possible)
Simple Merge • A point in a process where two or more branches are merged into a single branch • The initial branches are created via some type of choice