Wyoming Loads. WECC 2020 HSa1 vs. TEPPC 2020 PC0 Load Comparison 010711, JA. Platte. WECC 2020HSa1. TEPPC 2020 - Promod. Sheridan. WECC 2020HSa1. TEPPC 2020 - Promod. Firehole. TEPPC 2020 - Promod. WECC 2020HSa1. Bridger. WECC 2020HSa1. TEPPC 2020 - Promod. ORebasin.
E N D
Wyoming Loads WECC 2020 HSa1 vs. TEPPC 2020 PC0 Load Comparison 010711, JA
Platte WECC 2020HSa1 TEPPC 2020 - Promod
Sheridan WECC 2020HSa1 TEPPC 2020 - Promod
Firehole TEPPC 2020 - Promod WECC 2020HSa1
Bridger WECC 2020HSa1 TEPPC 2020 - Promod
ORebasin WECC 2020HSa1 TEPPC 2020 - Promod
East load numbers are the WECC LRS submittal sent March 8, 2010. PAC’s Load Submittal to LRS PAC’s IRP shows: PACE-WY annual Load Growth = 3.6% 1729x1.036 = 1791 MW 1871 MW TEPPC 2020-PC0