140 likes | 230 Views
Civil engineering for LIU – PS. Shielding of route Goward. Status – 22 may 2012. Document « Civil engineering for increasing the radiation shielding on the route Goward . Passage over the PS » completed → EDMS approval procedure ongoing (25 may 2012)
E N D
Civil engineering forLIU – PS Shielding of route Goward
Status – 22 may 2012 • Document « Civil engineering for increasing the radiation shielding on the route Goward. Passage over the PS » completed → EDMS approvalprocedureongoing (25 may 2012) • CE executiondrawingscompleted → EDMS approvalprocedureongoing (22 may 2012) • Tender documents completed → EDMS approvalprocedurecompleted (16 may 2012) • Marketsurveycompleted → list of firms to befinalized ( translation in english of the tender documents to beconfirmeddepending on the nationality of the selectedfirms) NEXT STEPS • Launch call of tender • Organize an information campaign to the attention of the occupants of the center of the ring NEW ! • Two “sondages” requested by RP to determine if the ground around the PS is contaminated → potential impacts on the method of execution and the cost / delay of work Reminder: the assumption for this project was that there was no RP constraints for materials and/or workers
Provisional Schedule Travaux préparatoires avant chantier de génie civil: -Evacuation des transformateurs –EN/EL -Abattage des arbres GS/IS -Dépose des candélabres – GS/SE -Dépose des moniteurs RP - DGS/RP - Autres??