1 / 3

Power Management System

Hardware Milestone: 0. Software Milestone: 0. Requirements: Interface with the existing bicycle battery voltage (35-40V typical) Provide stable, well-regulated power to each EBM subsystem Automatic shutdown at low voltage level (35V) Additional Aspirations:

lilith
Download Presentation

Power Management System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hardware Milestone: 0 Software Milestone: 0 • Requirements: • Interface with the existing bicycle battery voltage (35-40V typical) • Provide stable, well-regulated power to each EBM subsystem • Automatic shutdown at low voltage level (35V) • Additional Aspirations: • Avoid wasting battery power with high efficiency design • Minimize complexity • Objectives: • Identify all voltage/current needs from subsystems • Identify subsystem I/O software requirements • Develop “Power Budget” and battery charge life • Research specific solutions and identify component candidates • Design and model hardware schematic • Alpha test under laboratory conditions • Integrate into EBM subsystems and measure performance Power Management System

  2. Hardware Milestone: 0 Software Milestone: 0 Power Management System • Specific power supply parts have not yet been selected pending other subsystem part selection

  3. Hardware Milestone: 0 Software Milestone: 0 Solution being implemented: A mix of DC-DC Buck Converter and LDO Linear Regulators • Requirements from top level: • Step down 35-40V main battery voltage to first subsystem voltage level • Needs from other subsystems: • MCU • Low voltage shutdown command Power Management System Requirements from other subsystems, “Power Budget”:

More Related