WELCOME TO LANMEI

WELCOME TO LANMEI. LOCATION. MISSION. - Serve our customers to their satisfaction with our highest integrity. - Look for long term business partnership accomplishing the growth with our customers. CONTINUOUS IMPROVEMENT. HISTORY OF COMPANY.

Download Presentation

WELCOME TO LANMEI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME TO LANMEI

  2. LOCATION

  3. MISSION - Serve our customers to their satisfaction with our highest integrity. - Look for long term business partnership accomplishing the growth with our customers. CONTINUOUS IMPROVEMENT

  4. HISTORY OF COMPANY CAMEI was established since 1980 in HK -29years ago. 1st production site was built in China in 1982 at DongguanHau Jie. It was then expanded and moved to He Zhou since 1989. 2nd production site with double size was built in Dongguan Da Ling Shan since 1995. Lanmei is a new plant built with China Domestic selling license.

  5. ORGANIZATION Costing Finance Engineering Shipping Production Lee Yuen Hing Quality Lanmei Sun Hing Purchase DIRECTOR General Manager

  6. McDonald’s Products: McDonald’s Products:

  7. BUSINESS NATURE: O.E.M. Products: Mainly Hard Toys • Injection molding • Die Casting • Roto Casting • Blow Molding • IC Electronic etc

  8. MANPOWER

  9. FACILITIES-Molding Machines

  10. FACILITIES- Others

  11. RECOGNITION General Compliance 1) ISO 9001:2000 2) Internal physical lab ISO17025 standard 3) ICTI Seal 4) Wal-Mart Ethical Standards 5) C-Tpat (Customs & Trade Partnership Against Terrorism) • McDonald’s Audit History of (Sun Hing) – Mar 2007 • 1) McDonald’sSocial Accountability Audit – Green Result • McDonald’s Quality & Safety – Pass • McDonald’s Sanitation Audit – Pass • McDonald’s Audit History of (Lanmei) – Mar 2009 • 1) McDonald’sSocial Accountability Audit – Green Result • McDonald’s Quality & Safety – TBA • McDonald’s Sanitation Audit – TBA

  12. ISO 9001:2000

  13. ICTI / CCC

  14. Plastic Injection

  15. Vertical Molding

  16. Double Injection

  17. RotoCasting

  18. Blow Molding

  19. Tempo Printing

  20. Spray Painting

  21. Assembly Line &Packaging

  22. QA Laboratory

  23. PROJECT MANAGEMENT-Incoming and IQC Report Martial IQC Repot Inspection Report Defect Report

  24. Quality Control - Injection Process • Assigned molding machine for product mold unit • Critical parameter and sign sample is placed • Record and check the critical parameter of each machine by QC on each shift daily. (ie cycle time, injection pressure, injection temperature, shot weight, reground material level • AQL inspection checking by QC every batch of molding according to In-house molding QC procedure • Sampling drawn the test unit to internal lab for Physical test every shift daily

  25. Quality Control – QC/QA Rooms We proceed the QC and QA testes in special rooms QC Room

  26. Quality Control - QC Daily Report QC Injection QC Daily Report Production QC Report

  27. Quality Control - Deco Process • Assigned Tempo painting machine and assigned paint storage area to prevent any contamination. • All Paints were Heavy Element tested before use • Sign sample is placed • 100% appearance check by Line inspector • AQL inspection checking by QC every batch of deco unit according to In-house QC procedure

  28. Quality Control - Assembly and Packaging Process • UV light • Metal detector check before packing in Carton • Patrol inspection & final inspection by batch of packed unit according to In-house QC procedure • Packed unit will be stored in security area before shipment

  29. Process Control - Assembly and Packaging • Sharp tools control exists • Work instruction, QC inspection • procedure and Sign sample placed • 100% Cleaning, appearance and • correct assembly check by Line inspector

  30. Production Automation Robotic Arm for injection Auto-carton pack

  31. TEAM BUILDING Employees are encouraged to participate social activities such as the Badminton Tournament held by HFE, we have just won the 2007 champion