1 / 5

Developing Systems for Tracking – post P Levels!

Developing Systems for Tracking – post P Levels!. Performance – P Scale – attainment targets for pupils with special educational needs July 2014.

Download Presentation

Developing Systems for Tracking – post P Levels!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Developing Systems for Tracking – post P Levels!

  2. Performance – P Scale – attainment targets for pupils with special educational needsJuly 2014 • “The use of P scales is statutory for reporting teacher assessment in English, mathematics and science to the Department for Education at the end of key stages 1 and 2.”

  3. School Inspection HandbookAugust 2014 • 202. • Where ‘Progression 2010–11’ is used to contribute to the school’s analysis then the starting point for evaluation is that expected progress is the median level for pupils’ age and starting point.

  4. B Squared

  5. CASPAComparison and Analysis of Special Pupil Attainment

More Related