An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MQXFS6: Plans for next assembly Paolo Ferracin on behalf of the MQXF collaboration 03/04/2019 WP3 Meeting CERN

  2. Acknowledgments • CERN • A. Ballarino, H. Bajas, M. Bajko, B. Bordini, N. Bourcey, J.C. Perez, S. Izquierdo Bermudez, S. Ferradas Troitino, L. Fiscarelli, J. Fleiter, M. Guinchard, O. Housiaux, F. Lackner, F. Mangiarotti, A. Milanese, P. Moyret, H. Prin, R. Principe, E. Ravaioli, T. Sahner, S. Sequeira Tavares, E. Takala, E. Todesco • US Accelerator Upgrade Project (AUP) • BNL: M. Anerella, P. Joshi, J. Muratore, J. Schmalzle, P. Wanderer • FNAL: G. Ambrosio, M. Baldini, J. Blowers, R. Bossert, G. Chlachidze, L. Cooley, S. Krave, F. Nobrega, V. Marinozzi, I. Novitsky, C. Santini, S. Stoynev, T. Strauss, M. Yu • LBNL: E. Anderssen,D. Cheng, M. Marchevsky, H. Pan, I. Pong, S. Prestemon, G. Sabbi, G. Vallone, X. Wang • NHMFL: Lance Cooley Paolo Ferracin

  3. Coil tested in MQXFS6 • Coil 208 (PIT with bundle) • Cable H16EC0214A • Cabling degradation: 7.4% • RRR witness: 83 • Coil 209 (PIT with bundle) • Cable H16EC0214B • Cabling degradation: 7.4% • RRR witness: 74 • Coil 210 (PIT with bundle) • Cable H16EC0247A • Cabling degradation: 11.4% or 12.4% • RRR witness: 121 • Coil 212 (PIT with bundle) • Cable H16EC0247C • Cabling degradation: 11.4% or 12.4% • RRR witness: 124 Paolo Ferracin

  4. Available spare coils with PIT • Coil 207 (PIT without) • Cable H16EC0207A • Cabling degradation: 2.9% • RRR witness: ~140 (TBC) • Coil 211 (PIT with bundle) • Cable H16EC0247B • Cabling degradation: 11.4% or 12.4% • RRR witness: ~120 (TBC) • Proposal • Replace 208 and 209 with 207 and 2011 Paolo Ferracin

  5. NCR Paolo Ferracin

  6. 211 NCR Paolo Ferracin

  7. 211 NCR Paolo Ferracin

  8. 211 NCR Paolo Ferracin

  9. MQXFS5 • Coil 203, 204, 205, 206 • 90% at 1.9 K, 96% at 4.2 K Paolo Ferracin