1 / 1

CMGT 410 Week 2 Documenting the Project Lifecycle//tutorfortune.com

CMGT 410 Week 2 Documenting the Project Lifecycle//tutorfortune.com<br><br>Click on below link to buy<br>https://tutorfortune.com/products/cmgt-410-week-2-documenting-the-project-lifecycle<br><br>CMGT 410 Week 2 Documenting the Project Lifecycle<br> <br><br>Well-written project documentation clarifies intent, documents decisions and results, and allows project managers to assess project progress (and report it, as necessary, to project stakeholders) at every step of the project lifecycle.<br><br>For this assignment, you will create two examples of project documentation that align with the Project Plan Draft assignment you completed in Week 1. The documentation you will create for this assignment aligns with the initiation and planning phases of a project.<br><br>If you chose the waterfall methodology for your Week 1 Project Plan Draft assignment, create the following:<br><br>A business requirements document, or BRD: Use the Business Requirements Template as the basis for your BRD.<br><br>A work breakdown schedule, or WBS: Use the Work Breakdown Structure (WBS) Example document as the basis for your WBS.<br>Alternatively, if you chose the Agile methodology for your Week 1 Project Plan Draft assignment, create the following:<br><br>A product requirements document, or PRD: Read u201cProduct Requirements Documents, Downsizedu201d for assistance in creating this document.<br><br>User stories/scenarios and acceptance criteria: Review u201cAgile Requirements Snail: Feature to User Story to Scenariou201d for help in creating this document. Then use the Scenarios and COS tabs located in User Scenarios And Acceptance Criteria Example as the basis for your user stories/scenarios and acceptance criteria.<br><br>Submit your completed BRD and WBS, or your completed PRD and user stories/scenarios with acceptance criteria.<br>CMGT 410 Week 2 Documenting the Project Lifecycle<br><br>Click on below link to buy<br>https://tutorfortune.com/products/cmgt-410-week-2-documenting-the-project-lifecycle<br>

limtil1
Download Presentation

CMGT 410 Week 2 Documenting the Project Lifecycle//tutorfortune.com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMGT 410 Week 2 Documenting the Project Lifecycle//tutorfortune.com Click on below link to buy https://tutorfortune.com/products/cmgt-410-week-2-documenting-the-project-lifecycle CMGT 410 Week 2 Documenting the Project Lifecycle   Well-written project documentation clarifies intent, documents decisions and results, and allows project managers to assess project progress (and report it, as necessary, to  project stakeholders) at every step of the project lifecycle. For this assignment, you will create two examples of project documentation that align  with the Project Plan Draft assignment you completed in Week 1. The documentation  you will create for this assignment aligns with the initiation and planning phases of a  project. If you chose the waterfall methodology for your Week 1 Project Plan Draft assignment,  create the following: A business requirements document, or BRD: Use the Business Requirements  Template as the basis for your BRD. A work breakdown schedule, or WBS: Use the Work Breakdown Structure (WBS)  Example document as the basis for your WBS. Alternatively, if you chose the Agile methodology for your Week 1 Project Plan Draft  assignment, create the following: A product requirements document, or PRD: Read “Product Requirements Documents,  Downsized” for assistance in creating this document. User stories/scenarios and acceptance criteria: Review “Agile Requirements Snail:  Feature to User Story to Scenario” for help in creating this document. Then use  the Scenarios and COS tabs located in User Scenarios And Acceptance Criteria  Example as the basis for your user stories/scenarios and acceptance criteria. Submit your completed BRD and WBS, or your completed PRD and user  stories/scenarios with acceptance criteria. CMGT 410 Week 2 Documenting the Project Lifecycle Click on below link to buy https://tutorfortune.com/products/cmgt-410-week-2-documenting-the-project-lifecycle

More Related