WLTP DTP PM-PN Subgroup Activity Report

WLTP DTP PM-PN Subgroup Activity Report. 9 th DTP Meeting / Bern 16 th -18 th April 2012 C. Hosier / C. Vallaude. Overview. Open issues Data to gather during validation 2 GTR drafting Next meeting. Open Issues. OIL => same as GRPE (Jan 2012) OI left need input from VP2

lindsay
Download Presentation

WLTP DTP PM-PN Subgroup Activity Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WLTP DTP PM-PN Subgroup Activity Report 9th DTP Meeting / Bern 16th-18th April 2012 C. Hosier / C. Vallaude

  2. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Overview • Open issues • Data to gather during validation 2 • GTR drafting • Next meeting

  3. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Open Issues • OIL => same as GRPE (Jan 2012) • OI left need input from VP2 • PM-PN Parameter list => same as GRPE (Jan 2012) • commented to answer questions from VTF+PL 30th of March meeting

  4. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Data To Gather During Validation 2 (1/2) • PM filter conditioning • Minimum conditioning time required • Dilution tunnel pre-conditioning and background • Is 20 minutes pre-conditioning at 120kph sufficient? • Tunnel PN background levels • Experience on PN during DPF regeneration • To confirm PN measurement system is capable of excluding worst case volatile material during DPF regenerations • CVS and filter face temperatures during regenerations? => Integrated in parameter list and global test matrix

  5. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Data To Gather During Validation 2 (2/2) • Ki determination • Mode construction • PM-PN parameter list • PN during regeneration • Vehicles • Will need regen indicator and inhibitor switch • Measure PN before, during and after regeneration • Different PN measurement systems • Two systems per lab sampling in parallel • Impact of VPR pcrf • Test over range from 100-3000 (one system at high, one at low setting each test) • Two tests at each pcrf setting • Impact of CVS dilution on nucleation mode particles • Test at max and min CVS dilution • DPF fill procedure • Either fast loading on engine dyno or on vehicle loading • Follow R83 advice on fill state stabilisation for pre-regen tests • VPR sulphate removal capability • Test with highest sulphur lube oil permitted by OEM and fuel at maximum (10/15mg/kg) sulphur limit • Tested by JRC and ACEA

  6. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 GTR Drafting • PM/PN GTR draft integrated by DC in the global GTR Draft in March 2012 • Drafting audioconf on the 23td of March to validate the text and answer DC questions • => 3 minor new OI opened • Retain or not guidance of filter handling • Add a zero span procedure for the balance? • Precision of when the PN measurement should be started

  7. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Next Meeting • Next meeting: • Webconf on the 15th of May 2012 • Agenda: • New OI from drafting • Start on calibration procedure • If available have a first look at the validation 2 outputs • Organization of VP2 data analysis

  8. PM/PN Subgroup DTP9 Bern 16-18th of April 2012 Thank you for your attention