110 likes | 268 Views
EUROCAE WG-78 / RTCA SC-214 Sub-Group Meeting Luxembourg, 13-17 February 2012. CSG Progress Report Meeting Objectives Work Organisation. Jane HAMELINK , (THANE) RTCA CSG Co-Chair Thierry LELIEVRE , (ALTRAN) EUROCAE CSG Co-Chair. SC214/WG78 CSG Meetings and Webex
E N D
EUROCAE WG-78 / RTCA SC-214 Sub-Group Meeting Luxembourg, 13-17 February 2012 CSG Progress Report Meeting Objectives Work Organisation Jane HAMELINK , (THANE) RTCA CSG Co-Chair Thierry LELIEVRE, (ALTRAN) EUROCAE CSG Co-Chair
SC214/WG78 CSG Meetings and Webex (sincePlenary #14, Washington DC, December2011) • SPR / INTEROP Version I 1 Feb 2012 release • CPDLC Msg Set • ED154 / DO305 Ed. A • Weekly CSG Webex + Dedicated CSG Webex • Resolution of Comments/PDRs Assessment • CPLDC Message Set • FIM, ATS Function, ...
ED154 / DO 305 Rev. A • ED154 / DO 305 Rev. A delivered to RTCA / EUROCAE for Publication • ED-154_A_FANS_1A-ATN_INTEROP_Standard_FINAL_04Jan2012.doc and DO-305_A_FANS_1A-ATN_INTEROP_Standard_FINAL_04Jan2012.doc avaliable on the FAA website • This version includes resolution of all comments received from FAA and EUROCONTROL (see FAA Comments for DO-305a-ED154a Revised by CSG 21December2011.xls)
CPDLC Message Set Status • CPDLC Message Set Assessment by CSG shallbeconsideredas completed • Stillunder validation in SESAR/NEXGEN… • Under OPLINK Approvalprocess…. • => How to coordinatecomments on CPDLC Message Set with OPLINK? • CPDLC Message set (as in Version I) will be presented to next OPLINK To be completed with figures
SPR / INTEROP Version I – FAA Release • PU-10 SPR Version I : • PU-10_SPR-I_Chapter 1-Introduction_1-February-2012.doc • PU-10_SPR-I_Chapter 2-ATS Functions_1-February-2012.doc • PU-10_SPR-I_Chapter 3-ATS Services Description_1-February-2012.doc • PU-10_SPR-I_Chapter 4-CM_1-February-2012.doc • PU-10_SPR-I_Chapter 5-CPLDC _1-February-2012.doc • PU-10_SPR-I_Chapter 6-ADS-C_1-February-2012.doc • PU-10_SPR-I_Chapter 7-FIS_1-February-2012.doc • PU-10_SPR-I_AnnexA-OSA-Approach_1-February-2012.doc • PU-10_SPR-I_AnnexB-CPDLC-OSA_1-February-2012.doc • PU-10_SPR-I_AnnexC-ADSC-OSA_1-February-2012.doc • PU-10_SPR-I_AnnexD-DFIS-OSA_1-February-2012.doc Not Available • PU-10_SPR-I_AnnexEFGH-OPA_1-February-2012.doc • PU-10_SPR-I_Master-Comment-Matrix_1-February-2012.xls • New document reference! • Harmonisation of numbering of new OR (against Version H): • Ex: CPDLC-I-OR xx • => Available on our FAA Website! • PU-20 INTEROP ATN Version I : • PU-20-I_ATS_INTEROP_(01FEB12)_Part1-I.doc • PU-20-I _ATS_INTEROP_(01FEB12)_Part2-I.doc • PU-20-I _ATS_INTEROP_(01FEB12)_Part3-I.doc • PU-20-I _ATS_INTEROP_(01FEB12)_Part4-I.doc • PU-20-I _ATS_INTEROP_(01FEB12)_Part5-I.doc • PU-20-I _ ATS_INTEROP_(01FEB12)_CM-POICS.doc • PU-20-I _ ATS_INTEROP_(01FEB12)_ADSC-POICS.doc • Note: Update of CPLDC and FIS POICS still under progress. • PU-20_INTEROP-I_Master-Comment-Matrix_1-February-2012.xls • PU-30 INTEROP FANS/ATN Version I : • PU-30-I_FANS_INTEROP_ (01FEB12).doc • Technical Manual : • PU-40-I_PMADS_(01FEB12).doc • PU-50-I_PMFIS_(01FEB12).doc
PDRsStatusoverview (on version H) 323 PDRs Created 322 Resolved against version H • 1 « Working » PDR on INTEROP
CommentsStatusoverview (on version I - input for P14) 164 SPR Cmts 54 INTEROP ATN Cmts 11 INTEROP FANS Cmts • 19 SPR Cmts are Deferred : e.g. Redundancy with GOLD, Removal of 4DTRAD Ground-Ground, Global Editorial, Service description consistency, FIS/D-RVR, … • 3 INTEROP FANS Cmts are « Working » : • Accommodation rules for : • UM151 WHEN CAN YOU ACCEPT [speed] , • DM109R110R111R TOP OF DESCENT AT TIME [timesec] AT [position], • DM106R PREFERRED LEVEL [level single] and • DM25 REQUEST [clearance type] CLEARANCE
Main « Changes » in version I – 1 February 2012 (Since P14 in addition of Comment resolution) • Consolidation of the ATS Functions: • List of ATS Function • RCP Allocation • Autoload Criteria • New “Route Clearance Handling” Section & rules for Autoloading • Based upon Boeing/Airbus White Papers presented in P14 • Last update of CPLDC Message Set • DM147 REQUEST DE-ICING [Position] is re-introduced upon SESAR/D-TAXI Team Request • New message: UM275 HAZARDOUS WEATHER [HZWX Specification] • DM147 CONFIRM REQUEST isre-introduced but operational use has to beclarified • Replacement of UM134/DM113 by UM134R REPORT [SpeedTypes] SPEED / DM113R [SpeedTypes] SPEED [Speed] • [SpeedTypes] being a Sequence of SpeedTypeR (IAS, Mach, True)/ SpeedPhase (Cruise/Approach) / SpeedLimit (Min/Max) • Consolidation of D-HZWX OSD (Operating Method and Definition of Message) • Update of CPDLC/ADS-C OSA and OPA
Main « Open » Topics for next release (and for thisweek) • Consolidation of ATS Functions: • Validation RCP Allocation • Validation of Autoload Criteria • Consolidation of “Route Clearance Handling” Section & rules for Autoloading • Clarification about the use of ADS-C Generation Time • Review of ADS-C OSA/OPA • Review of D-HZWX OSD and Consolidation of D-HZWX (DFIS) OSA / OPA • Resolution of some of “Deferred / Working” comments • Review the Paper for OPLINK (CPLDC changes in Doc 4444)