210 likes | 309 Views
SHAPE the Future The new NATO CIS Group by BGen Bert Booman SHAPE / DIR CIS 26 June 2012. Agenda Organizational change NCISG’s mission & tasks Structure and footprint CONOPS (example) Future developments Q & A. Current NCSA Organisation. DIRECTOR NCSA. LEGAD. PAO. FINCON. SECTOR MONS.
E N D
SHAPE the FutureThe new NATO CIS Groupby BGen Bert BoomanSHAPE / DIR CIS26 June 2012 • Agenda • Organizational change • NCISG’s mission & tasks • Structure and footprint • CONOPS (example) • Future developments • Q & A
Current NCSA Organisation DIRECTOR NCSA LEGAD PAO FINCON SECTOR MONS NATO CIS LOG DEPOTNCCLDBRUNSSUM SQN STAVANGER SQN NORTHWOOD DEPUTY DIR/COS FSP NAPLES FSP BYDGOSZCZ SECTOR NORFOLK COSO Technical DIR NATO CIS SCHOOL NCISS LATINA SECTOR BRUNSSUM NATO PROG CENTRE NPC GLONS Director OPS SQN RAMSTEIN SQN HEIDELBERG CENTRAL SQN BYDGOSZCZ PPC DOED SECTOR LISBON COD NATO SIG RGTNSR BRUNSSUM MPT OPS CEN SMD SQN MADRID 1 NSB WESEL BAF NIATC SECTOR NAPLES SDD 2 NSB GRAZZANISE LMD SQN NISIDA SQN IZMIR 3 NSB BYDGOSZCZ NCSA HQ STAFF STATIC DEPLOYABLE
NATO CIS Group Current NCSA Organisation DIRECTOR NCSA LEGAD PAO FINCON SECTOR MONS NATO CIS LOG DEPOTNCCLDBRUNSSUM SQN STAVANGER SQN NORTHWOOD DEPUTY DIR/COS FSP NAPLES FSP BYDGOSZCZ SECTOR NORFOLK COSO Technical DIR NATO CIS SCHOOL NCISS LATINA SECTOR BRUNSSUM NATO PROG CENTRE NPC GLONS Director OPS SQN RAMSTEIN SQN HEIDELBERG CENTRAL SQN BYDGOSZCZ PPC DOED SECTOR LISBON COD NATO SIG RGTNSR BRUNSSUM MPT OPS CEN SMD SQN MADRID 1 NSB WESEL BAF NIATC SECTOR NAPLES SDD 2 NSB GRAZZANISE LMD SQN NISIDA SQN IZMIR 3 NSB BYDGOSZCZ NCSA HQ STAFF STATIC DEPLOYABLE
Commander NATO CIS Group NATO CIS Group HQs 1 NSB 2 NSB 3 NSB 1 NAT DCM (56) 1 NAT DCM (56) 2 NAT DCMs (112) 470 470 470 NATO CIS Group TOTAL PE POSTS = 1513 “Ceiling posts”: 1289
Mission Statement Provide deployable CIS support in order to allow SACEUR to command and control NATO led missions and operations
Main task: CIS support to OPS (incl. Exercises) Static environment Operational environment Delegation SACEUR Theater Cdr OPCON* CIS Gp Elements Support Packages C-CIS Gp ** SLAs GM NCIA Other NATO organizations and Nations Defined in OPLAN * OPCOM if needed** if conditions are met (e.g. CISAF 11)
SHAPE (950) (Mons) Colour Key Joint Air Land Maritime ACCI NATO CIS Group (1300) (Mons(+)) SOF Theatre/Op Allied Joint HQ (850) (Brunssum) Land Command HQ (350) (Izmir) Air Command HQ (500) (Ramstein) Maritime Command HQ (300) (Northwood) Allied Joint HQ (850) (Naples) CAOC (185) (Uedem) CAOC (185) (Torrejon) DACC (280) (Poggio Renatico) Structure per 1 December 2012 Allied Command Operations (ACO) HQ NATO (Brussels) Other NATO Entities ACT (Norfolk(+)) C&I Agency (Brussels,The Hague,Mons) Spt Agency (Capellen) NATO Force Structure NSHQ (Mons) NAEW AGS JEWCS SFN ASC
Commander NATO CIS Group CIS & CD Directorate NATO CIS Group HQs 1 NSB 2 NSB 3 NSB 1 NAT DCM (56) 1 NAT DCM (56) 2 NAT DCMs (112) CIS Ops & Plans 22 470 470 470 CIS Service Management 29 Cyber Defense 20 Chain of command SACEUR COS SHAPE Twinned Posts 1/3 J6
II II NATO CIS Group NATO CIS Gp STAFF ELEMENT II Mons National DCMs WESEL 1 NSB M&SCoy M&S M&S M&S DCM DCM Coy DCM Coy Coy Elmpt (DEU) Haderslev Wesel GRAZZANISE 2 NSB M&S Coy Coy Coy Coy DCM DCM DCM DCM Grazzanise (ITA) Grazzanise (ITA) Bucharest Sofia BYDGOSZCZ 3 NSB M&S Coy Coy Coy Coy DCM Lipnik nad Becvou Liptovsky Mikulas Bydgoszcz Izmir Vilnius Szekesfehervar
1 NSB M&SCoy C D A E B M&S Coy B C F A D E M&S B C D F A E Coy 2 NSB DCIS Footprint 3 NSB
JTF HQ ICE C2 support by follow-on force FCE OLRT TLK LINC-E Reach back MS, NS, NU NCIA CIS GROUP Deployable Core CIS Static CIS Infrastructure Concept of Operations (example) Apps
Developments • CP149; delivery of equipment and applications • Further alignment with FMN • In 2014: evaluation of new structure FMN Concept (delivery) AMN FOC Lessons approved Strategy for PIE ? FMN Concept (approval) “Light Hybrid” Evaluation report 2012 2013 2014 2015 2016 AMN FOC Delivery CIS Gp Transformation AMN 2011 CP Review NCIA Capability Building AMN 2012