900 likes | 1.03k Views
89th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks. March 16-21, 2014 China World and Traders Hotels Beijing, PRC. 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting. Secretary
E N D
89th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 16-21, 2014 China World and Traders Hotels Beijing, PRC Robert F. Heile, ZigBee Alliance
802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 Study Groups/Interest Groups New Projects (WNG), Maintenance, Rules Pat Kinney, Kinney Consulting Study Groups: SG100G THz link Chair: Thomas Kürner Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories Visible Light Comm follow-on (LED) Chair: Yeong Min Jang Kookmin University SG Distance Measurement Techniques Chair: Dietmar Eggart Atmel Interest Groups TeraHertz (THZ) Hibernating Chair: Thomas Kürner, Technische Universität Braunschweig Task Groups TG15.4q Ultra Low Power (ULP) 15.4 Shahriar Emami, Samsung Chair TG4m 15.4 TV White Space PHY Sangsung Choi, ETRI Chair TG8 Peer Aware Communcations Miung Lee, CUNY Chair TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio Chair TG4p 15.4 Rail Communication (RCC) Chair: Jon Adams, Lilee Systems Chair 802.15 Organization Chart TG9 Key Management Protocol Robert Moskowitz, Verizon Chair TG10 Layer 2 Routing Clint Powell Chair Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 TASK GROUP-4m : TVWS PHY for 15.4 (4TV) • Draft is on the RevCom agenda for final approval • Resolve any RevCom comments TASK GROUP4n –China MBAN • Completed initial letter ballot • Resolve Letter Ballot comments • Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 TASK GROUP-4p Rail Communications and Control • Draft is on the RevCom agenda for final approval • Resolve any RevCom comments Task Group 4q: 15.4 Ultra Low Power Amendment • Hear any proposal updates • Settle on a technical baseline • Update Project Timeline according TASK GROUP-8 Peer Aware Communications • Continue work on draft • Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 • TASK GROUP 9 –Key Management Protocol: • Work on draft • Update Project Plan/Timeline • TASK GROUP 10--Layer 2 Routing (L2R): • Hear responses to the CFA • Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 • 100G Study Group (100 Gbps THz PHY for 15.3) • Get PAR and 5C approved by the EC • Kick-off supporting 802.1 PAR activity • THz Interest Group: • Hibernating for the moment • Spectrum Resource Use (SRU) Study Group: • Work on PAR and 5C • Hear Contributions Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 • Visible Light Comm follow-on(LED) Study Group: • Hear Contributions • Work on PAR and 5C • 15.4 Distance Measurements Techniques-SG • Get PAR and 5C approved by the EC • Kick-off supporting 802.1 PAR activity • Dependability Interest Group: • Hear Contributions • Discuss future of the Committee Robert F. Heile, ZigBee Alliance
Beijing Session ObjectivesMarch 16-21, 2014 NEW PROJECTS SUBCOMMITTEE • Report on WNG progress • Hear new presentations Maintenance Standing Committee • Review 15.4 Revision activity Robert F. Heile, ZigBee Alliance
March Plenary Session Results Robert F. Heile, ZigBee Alliance
IEEE 802.15 TG4n Chinese Medical Band Closing Report 11th Meeting as a Task Group 4n Beijing, China March 20, 2014
Meeting Accomplishments • Letter Ballot (LB-93) Results: • Voter: 134, Voted: 103, Voting Rate: 76.87% • Yes 90(87%), No 5 (5%), Abstain 8 (8%) • LB-93 Passed with 240 comments d1P802-15-4n_Draft_Standard.pdf
Meeting Accomplishments • Invite the major commenters to explain their comments • Go though commends with the initial resolution and ideas • Move the motions for BRC d1P802-15-4n_Draft_Standard.pdf
BRC members as approved by TG4n • Arthur Astrin • Kenichi Mori • Masahiro Kuroda • Dietmar Eggert • Rick Powell • Liang Li • WeiXia Zou
BRC conference calls • Each Thursday at 9:00pm Pacific • Date to be determined: • March 27, • Apr. 3, Apr. 10, Apr. 17, Apr. 24, • May, 8
Motion for 802.15.4n TG • Move that 802.15.4n TG approve the formation of a Ballot Resolution Committee (BRC) for the TG balloting of the 802.15.4n draft standard with the following membership: Arthur Astrin, Kenichi Mori, Masahiro Kuroda, Dietmar Eggert, Rick Powell, Wei Xia Zou and Liang Li. The 802.15.4n BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the 802.15.4n draft on behalf of the 802.15.4n TG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector at least 7 days in advance. • Moved by Kenichi Mori; Seconded by Masahiro Kuroda • Y/N/A : 3/0/0 • Motion Carried by no opposition
Motion for 802.15 WG • Move that 802.15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the 802.15.4n draft standard with the following membership: Arthur Astrin, Kenichi Mori, Masahiro Kuroda, Dietmar Eggert, Rick Powell, Wei Xia Zou and Liang Li. The 802.15.4n BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the 802.15.4n draft on behalf of the 802.15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector at least 7 days in advance. • Moved by Liang Li; Seconded by Benjamin A. Rolfe • Motion Carried by no opposition
Next Steps • Set up BRC teleconference call • Each Thursday at 9:00pm Pacific Date to be determined: March 27, Apr. 3, Apr. 10, Apr. 17, Apr. 24, May, 8
Beijing China March 2014 March 2014 ULP TG Closing Report Allan Zhu, Samsung
March 2013 Sessions • Total of 5 time slots • Tuesday: AM1, PM1 and PM2 (cancelled) • Wednesday: PM2 (cancelled) • Thursday: AM1 Allan Zhu, Samsung
Achievements • Heard updates on the merged OOK proposal • Accepted both GFSK and OOK proposals as baseline of the draft • Started drafting the initial spec • Planned for the next two meetings • Determined teleconference times Allan Zhu, Samsung
May Work Plan • Sub-editors to finish the initial draft one week before the May meeting • Review and discuss the initial draft • Elect editor(s) Allan Zhu, Samsung
Allan Zhu, Samsung Teleconferences • Two teleconferences scheduled: • 4/9 Wed 7:00AM PST, 19:30PM IST, 16:00PM CET • 4/30 Wed 7:00AM PST, 19:30PM IST, 16:00 PM CET
March 2014 Timeline (1) • Preliminary work • - Call for applications Dec 2012 • - Applications presentations Jan 2013 • - TGD outline March 2013 • - TGD, applications and channel modeling contribution call March 2013 • - Review TGD contributions May 2013 • - TGD Ongoing & review application contributions July 2013 • Proposal effort • - Call for intent July 2013 • - TGD completed Sep 2013 • - Call for proposals Sep 2013 • - Proposal presentations Nov 2013 • Drafting • - First draft May 2014 Allan Zhu, Samsung
Timeline (2) • Ballotable draft July 2014 • Balloting • - WG letter ballot July 2014 • - First recirculation Sep 2014 • - Conditional approval of sponsored ballot Nov 2014 • - Sponsor ballot Jan 2015 • - First recirculation March 2015 • - Conditional approval to submit to Revcom March 2015 Allan Zhu, Samsung
TG8 PAC Closing Report March 20, 2014 Myung Lee TG8 Chair Robert F. Heile, ZigBee Alliance
Meeting Objectives • Presentation of Preliminary Contribution • Discussion on Project plan, May contribution Robert F. Heile, ZigBee Alliance
Achievements • 6 time slots used at this meeting • Achieved all the objectives • 16 Contributions presented • Doc. 125r0: Huan-Bang Li • Doc. 174r0: Jeongseok Yu • Doc. 131r0: BJ Kwak • Doc. 134r0, 135r0, 136r0, 137r0, 138r0: Qing Li • Doc. 139r1: Seong-soon Joo • Doc. 130r0: Shannon Park • Doc. 114r0: Marco Hernandez • Doc. 117r0: David Smith • Doc. 124r0: Billy Verso • Doc. 128r0: Igor Dotlic • Doc. 132r0, 133r0: BJ Kwak Robert F. Heile, ZigBee Alliance
Achievements (cont) • Presentation of technical issues • MAC Comment List by Shannon Park • PHY Comment List by Marco Hernandez Robert F. Heile, ZigBee Alliance
Plan for May Meeting • All Main Contribution proposals to be presented • Discussion on main contribution proposals and Harmonization Robert F. Heile, ZigBee Alliance
Timeline • TG formation Mar 12 • Call for Application April 12 • Application presentation May 12 • TGD approval/Call for proposal Jan 13 • Re-affirmation of TGD/Call for proposal March 13 • Preliminary proposal presentation May, 13 • Final proposal presentation July 13 • PAC Framework Document/Call for contribution Jan. 14 • Contribution presentation March 14 • Draft spec (P802.15.8 D1.0) complete/Letter Ballot Sept 14 • LB Comment resolution/ LB recirculation Nov 14 • Sponsor Ballot July 15 • RevCom submission Jan 16 Robert F. Heile, ZigBee Alliance
TG8 PAC Officers • Chair: Myung Lee (CUNY) • Vice Chair: Huan-Bang Li (NICT) • Editors: Seung-Hoon Park (Samsung), Byung-Jae Kwak (ETRI) • Secretary SeungKwon Cho (ETRI) Robert F. Heile, ZigBee Alliance
Thank you! Robert F. Heile, ZigBee Alliance
Beijing, CN March 20, 2014 KMP TG9 Closing Report Robert F. Heile, ZigBee Alliance
Accomplishments of the Mar. Meeting • Reviewed progress on TG9 document • predraft6_P802-15-9_Draft_Standard_{clean,changes}.pdf • In the private area • Discussed document status • 15-14-0185-00-0009 • Substantial update to SAP interface • Goal of May for full document Robert F. Heile, ZigBee Alliance
Accomplishments of the Mar. Meeting • Substantial discussion of SAP/MLME issues with James Gilb • Much improved understanding of how things function in 802.15 MACs and what is required of interfaces • Rework of the text in draft6 needed • Partially reflected in 15-14/0184r1 Robert F. Heile, ZigBee Alliance
Conference Calls • Mar. 27, 2014, 6 – 7 p.m. EDT • Apr. 17, 2014, 5 – 6 p.m. EDT • WebEx will be used on calls • To synch Beijing results into next draft version Robert F. Heile, ZigBee Alliance
Planning for May Meeting • 3 sessions • Approve document to start balloting Robert F. Heile, ZigBee Alliance
Chair: Clint Powell, PWC LLC Beijing, CN March 20, 2014 TG10 Layer 2 Routing (L2R) Closing Report Robert F. Heile, ZigBee Alliance
802.15 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing 802.15.4 Mesh Networks.
Meeting Goals/Status • Recap Jan. 802.15 Interim and Current Status • Finish Work on Tech. Guidance Doc. • Review TG10 Timeline • Hear Presentation(s) • Discuss Next Steps
Accomplishments • Reviewed Jan. Session, Progress on Calls and Current Status • Revised Tech. Guidance Doc. (r5 - r8) • doc. # 15-13-0753-09 to be posted shortly • Reviewed Timeline • changes reflected in doc. # 15-13-0645-03 • No Presentations Given
Accomplishments (cont’d.) • Motion directing TG Chair to issue call for preliminary proposals approved • Calls scheduled - to finish TGD by 9th April • Minutes - doc. # 15-14-0179-00
Looking Forward Between Now and Kona (May) • Complete Tech. Guidance Doc. • Issue Call for Preliminary Proposals • At Kona (May) • Hear Preliminary Proposals • Revisit Tech. Guidance Doc. & Timeline Next Juncture w/802.1 • July Plenary (after Preliminary Proposals)
Conference Calls • Conference Call Info • 1st Call : Wed. 26th, March • Time: 3PM (Pacific) • Conf. Call #: To Be Sent to TG10 Reflector
Chair: Thomas Kuerner, Beijing, CN March 20, 2014 SG3d 100Gbps Switched Pt-Pt Closing Report Robert F. Heile, ZigBee Alliance
Closing Plenary Meeting Report for SG 100G Group (1/2) • Meeting was called to order at 13.30 am on March 17 and finished at March 2014 at 5.27 pm. • Number of meetings: 4 (plus a joint meeting with 802.1/802.15 TG10) • Total number of attendees :18 (plus additional 7 particpatimg in the joint meeting only) • Total number of contributions: 4 • Contributions • Contribution #1 :Thomas Kürner, TU Braunschweig (Germany), “Time Planning for the Task Group”; (Document 15-14-0155-01-003d) • Contribution #2 :James Gilb, self (USA), “Overview of 802.15.3”; (Document 15-14-0168-00-003d) • Contribution #3 :Hiroyo Ogawa, NICT (Japan),“ RoF-Based Terahertz Fronthaul for Mobile/Wireless Access Systems”; (Document 15-14-0177-02-003d) • Contribution #4 :Thomas Kürner, TU Braunschweig (Germany), “Propagation Characteristics for Intra-Device Communications”; (Document 15-14-0156-02-003d) Robert F. Heile, ZigBee Alliance
Closing Plenary Meeting Report for SG 100G Group (2/2) • Tasks completed during the meeting: • Working on responses (Document 15-14-0186-01-003d) to comments from IEEE 802.11 and John d’Ambrosio on the Drafts for PAR and 5C. New versions of PAR and CSD have been created (Documents 15-13-0523-07-0thz and 15-13-0522-06-0thz). • A straw poll for a 2nd extension of the study group has passed with 7 yes/0 no/0 abstain. • The Technical Expectation Document (Document 15-11-0745-13-0thz and the living document on Study Group items (Document 15-13-0692-02-0thz) have been reviewed and no updates have been made. The documents will be closed once the Study Group has been closed. Relevant of the TED will be transferred to the corresponding documents of the potential TG 3d. A new TED will be established within the IG THz. Robert F. Heile, ZigBee Alliance
Chair: DietmarEggert, Atmel Beijing, China March 2014 Closing Report of SG 4r Sessions Robert F. Heile, ZigBee Alliance