270 likes | 449 Views
EZ Valve ™ Technology: The Latest Advancement in Valve Insertion or Line Stopping 1 Machine, 2 Functions!. The EZ Valve. Preparation. Pipe is Cleaned. Gaskets are Inspected. Preparation. Gear-Box is Installed. Pipe is Taped. Preparation. Tape is Greased. Castings/Gaskets are Readied.
E N D
EZValve™ Technology:The Latest Advancementin Valve Insertion or Line Stopping1 Machine, 2 Functions!
Preparation Pipe is Cleaned Gaskets are Inspected
Preparation Gear-Box is Installed Pipe is Taped
Preparation Tape is Greased Castings/Gaskets are Readied
Preparation Castings are Greased Gaskets are Placed in the Castings and Greased
Installation Top Half of Valve is Placed on Pipe Bottom Half is Bolted in Place
Installation Valve is Leveled Chain Drive is Installed
Installation Mounting Plate is Attached Restraint-Ring is Installed
Installation The Valve is Filled With Water Chip-Flush Assembly is Attached
120º Slot Milling The EM Machine is Attached Pressure-Test is Performed
AVT’s EM-Machine EM Machine (End Mill) Temporarily mounts in place of valve bonnet and features field-replaceable cutting blades available in pneumatic, hydraulic or electric drives
120º Slot Milling Valve is Rotated to Cutting-Start Position EM Machine Utilizes Replaceable Carbide Inserts (2 Cutting Sides)
120º Slot Milling Cutting Begins and Pipe is Pierced The Pipe is Pierced
120º Slot Milling Valve is Rotated 120ºto Mill Slot Once Pipe is Pierced Chip Flushing Begins
120º Slot Milling Valve Assembly and Cutting Unit Are Rotated Milling is Finished and Cutter is Withdrawn From Pipe
120º Slot Milling EM Machine Removed Valve Returned to Upright Position & Isolation Gate Closed
Bonnet Attachment Mounting Plate Removed Valve Bonnet Installed
Bonnet Attachment Valve Gate is Closed 2/3 of the Way Isolation Gate Opened
Tool Removal End Rings Removed Chain Removed
Finishing Touches Final Tightening Performed & Restraint Bolts Installed Valve Completely Closed
Gate Activation Gate is Lowered Into Milled Slot Gate is Closed and Compressed into Pipe
Finishing Touches Chip-Flush Assembly Removed Pipe Plug Installed
Finishing Touches Bonnet Attached and Ready for Use Job is Complete
Tool Box All EZ Valve Equipment Comes in a 23” x 24” x 28” (584.2mm x 609.6mm x 711.2mm) Heavy-Duty Steel Jobsite Box Which Weighs 550lbs EZ Valve Equipment (4”-12” (118mm-326mm)
EZ Valve Has More IntegrityThan the Competition(Pipe Integrity That is) AVT EZ Valve Competitor Method 1 Competitor Method 2 Top 1/3 or More of Pipe Removed Entire Section of Pipe Removed 1-5/8” Slot Removed Side No Integrity or Thrust Restraint Issues! Integrity AND Thrust Restraint Issue Integrity Issue