130 likes | 141 Views
Infra ICD Leads. INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF?. INFRA:Dish. By T0 Description of current INFRA IF Identified (bullet list of requirements) using template By T0=12W (RR)
E N D
Infra ICD Leads • INFRA:DISH = DISH • INFRA: LFAA = LFAA • INFRA:SDP = SDP • INFRA:CSP = CSP • INFRA:SADT = SADT • INFRA:MGR = MGR • INFRA:AIV = No IF?
INFRA:Dish • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config
ICD INFRA and DSH... • Issues • Final Array Layouts • Loadings and Mechanical Interface • Responsibility for Bolt cage assembly (DISH?) • Power per antenna • Fibre / sleeve IF to DISH (INFRA or SaDT) • UPS for stowing (Dish or INFRA?) • Separate enclosure for Survey (RFI shielded) • Assume 10% of array can fail?
INFRA:MGR • Issue • No major IF issues • Control room location?
INFRA:MGR • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config
INFRA:SDP • Issues • Scale of SDP (Qty racks, power) • RSA : Location study • Power trade off (efficiency) • Power Quality, Redundancy • SDP technology selection timeline
INFRA:SDP • By T0 RSA Location study done IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config
ICD INFRA and SaDT..... Issues • Location of Super computer centre (RSA) • Use of existing Fibre links -AIV • Special requirements for Masers? • INFRA.COMMS data over network
INFRA: SADT • By T0 IF Identified (bullet list of requirements) using template • Location of RSA SDP study By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config
ICD INFRA and CSP • Issues • 250 racks for Pulsar search (RSA) • Rack requirements for LFAA/Survey (AUS) • CSP Distances (Survey)
INFRA:CSP • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config
ICD INFRA and LFAA.... • Issues: • Power system design (Solar?) • Beamformer Bunker
System Level issues • Array configuration • Firm requirements • Con Ops • RFI ITT • Construction supervision • Support Concept • Close loop on Costs • Scope of Hosting agreements