1 / 43

Exit Presentation

Exit Presentation. Evan Laske EV2 Summer 2010. Outline. Background Light Paper HDU (Habitat Development Unit) WSN (Wireless Sensor Network) Experience Gained Outside Work Future. Background. Home: Troy, MI. FIRST & Team 910. Programming Captain Teaching / Mentoring

liseli
Download Presentation

Exit Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Exit Presentation Evan Laske EV2 Summer 2010 Evan Laske – Exit Presentation – Summer 2010

  2. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  3. Background • Home: Troy, MI Evan Laske – Exit Presentation – Summer 2010

  4. FIRST & Team 910 • Programming Captain • Teaching / Mentoring • New Robotics Curriculum Evan Laske – Exit Presentation – Summer 2010

  5. Campus (In Theory) Houghton, MI Canada In Reality… Evan Laske – Exit Presentation – Summer 2010

  6. Double Major:Computer Eng./ Electrical Eng. (Dec. 2012) • Ultimate Frisbee • Broomball • BonzAI Brawl • Aerospace Enterprise Evan Laske – Exit Presentation – Summer 2010

  7. First Tour – DX4 (Fall 09) • Regen-ECLSS Failure Case Book • IVA Umbilical Summary Sheets • WHC Electrical Schematics • Crew/Flight Controller Lessons • Console OJTing (Sims, Flights, Increment) • Node 1 Heritage Panel • RCC Scanning (KX) • Co-op Achievement Award Evan Laske – Exit Presentation – Summer 2010

  8. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  9. Light Paper • Process for printing LEDs on flexible mediums • LED strings can be aligned, but polarities of strings inconsistent • Want to fly on ISS • Power supply needed to light entire panel Evan Laske – Exit Presentation – Summer 2010

  10. Design • +18V Vcc • +/-18V @ 120Hz Vout • Polarity Protection • Voltage Regulator • 555 Timer (Astable) • Switching MOSFETs in H-bridge configuration • Paper not here until September • Will be flight design Evan Laske – Exit Presentation – Summer 2010

  11. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  12. First Days Here…Troubleshooting • 3U CompactPCI Card with transition module. • 6U chassis with mechanical adapters • Pinout difference between 32-bit and 64-bit CompactPCI • Needed 1U chassis capable of 3U CompactPCI Evan Laske – Exit Presentation – Summer 2010

  13. HDU(Habitat Development Unit) • Fully autonomous habitation systems that enable human exploration of space. • Contributions: • Troubleshooting • Avionics Racks • Troubleshooting • Wireless Sensor Nodes • Troubleshooting Evan Laske – Exit Presentation – Summer 2010

  14. Avionics Rack • 2x Data Acquisition • Main module • Expansion Module • 1x VOIP Gateway • (Voice Over IP) • 1x NAT Switch • (Network Address Translation) • 1x WSN Manager • (Wireless Sensor Network) • 1x 12->48 V DC-DC Converter • 2x DECT Base Stations • (Digital Enhanced Cordless Telecommunications) Evan Laske – Exit Presentation – Summer 2010

  15. Single 1U Rack • Designed mounting brackets, etc. (Pro-E) • Worked with technician to do the final wiring. DAQ Modules WSN Gateway VOIP Gateway NAT Switch DECT Modules (stacked) DC-DC Converter Evan Laske – Exit Presentation – Summer 2010

  16. Troubleshooting • Antenna Grounding • DECT power supply • Required floating ground • Used original power supply to power both • VOIP Module Power • Working intermittently • Blown component on board • Loose power connector • Replaced with original • Replaced blown component Evan Laske – Exit Presentation – Summer 2010

  17. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  18. WSN(Wireless Sensor Network) • EV4 Project with EV2 Support • EV4: Wireless Mesh Network • EV2: Instrumentation, etc. Schematic/Board Design • Features • Wireless • Small footprint • Versatile DAQ system • Guaranteed data delivery • Low power (<5mA Tx) • Applications • Habitat Demonstration Unit (HDU) • EVA suit (LEGACI) • Project M • Lunar Electric Rover Evan Laske – Exit Presentation – Summer 2010

  19. Accel. Sensor Board • Created sensor board • Based on charge-amp circuit developed by Scott Hafermalz (EV4) • Any piezoelectric device • Connectors… • Board Design • Christy Herring • Rick Norman Evan Laske – Exit Presentation – Summer 2010

  20. Auto X-talk Testing • Manual Testing: • Signal generator in, grounded all other channels (jumpers) • UART output through amplifier to invert, etc. • Jury-rigged RS-232 connector • Solution: • One board on top of stack • On-board RS-232 level shifter • Single input, multiplexed to correct channel • Other channels grounded • Interface with NI DAQ-Card • Status: Design complete, not fabricated Evan Laske – Exit Presentation – Summer 2010

  21. Interface Board • UART -> RS-232 • USB Host/Peripheral Controller • SPI Interface • Firmware and/or Drivers • USB “Data Link” • SPI -> High-speed UART • High-speed UART -> USB • FTDI includes free drivers for chip • Allows faster transfers than UART->USB interfaces • Status: Layout in-progress Evan Laske – Exit Presentation – Summer 2010

  22. LEGACI • EVA suit development (EC3) • Metabolic & consumable data collection and calculation • WSN to control valve / collect sensor data • Un-tethered testing. • LEGACI = Lunar/Mars Exploration Guidance Algorithm and Consumables Interrogator Evan Laske – Exit Presentation – Summer 2010

  23. Serial API • Start with LEGACI development • Create a full API to handle all low-level ops • Interrupt driven & message-send protocols • Interface with printf() • Room for expansion to SPI and I2C Evan Laske – Exit Presentation – Summer 2010

  24. Final Days…Troubleshooting • Consistently dropped connections to manager • Antenna grounded incorrectly:Chassis to Instrumentation • Losing channel data • Amplifiers shorting Vcc to GND • Replaced amplifiers • WSN 28V line noise • cRIO controls power through relays • Before relays: good power • After relays : +/- 25V swings at ~15kHz • Bug in software • Some channels still not working • Amplifiers stressed that didn’t fail completely • Some nominal impedances were reliable showing good/bad/stressed amplifiers. Evan Laske – Exit Presentation – Summer 2010

  25. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  26. Experience Gained • OrCAD Simulation • Altium • Subversion • PCB Design Intricacies • Pro-E • Code-Composer • Firmware Development • More intuitive feel for electronics • Troubleshooting • Troubleshooting • Troubleshooting • Troubleshooting • Troubleshooting • Troubleshooting • Troubleshooting • Troubleshooting Evan Laske – Exit Presentation – Summer 2010

  27. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  28. Tours & Lectures • Ed Van Cise • ArcJet (B222) • Ad Astra • Aramadillo Aerospace Evan Laske – Exit Presentation – Summer 2010

  29. Companion Computers • Started in High School • Services: • Computer Repair / Upgrade • Networking • Website Design / Hosting • Course Scheduler • Android Development Evan Laske – Exit Presentation – Summer 2010

  30. Outline • Background • Light Paper • HDU (Habitat Development Unit) • WSN (Wireless Sensor Network) • Experience Gained • Outside Work • Future Evan Laske – Exit Presentation – Summer 2010

  31. Where Next • 2010 • Fall: MTU • 2011 • Spring: ER4 • Summer: ER4? • Study Abroad? • Fall: MTU • 2012 • Spring: MTU • Summer: ??? • Fall: MTU • GRADUATION! • After Graduation • Graduate School? • Co-op • Full-Time? Evan Laske – Exit Presentation – Summer 2010

  32. Acknowledgements • Susan Morgan • Paul Delaune • Greg Hall • David Eslinger • Ray Wagner • Scott Hafermalz • Rick Barton • Christy Herring • Rick Norman • Keith Grimm • Rest of EV Evan Laske – Exit Presentation – Summer 2010

  33. Questions? Evan Laske – Exit Presentation – Summer 2010

  34. Backup • HDU FY11 Planning Excerpts (3) • Light Paper Power Supply Circuit (1) • Charge-Amp Circuit (1) • Accelerometer Board Circuit (1) • X-Talk Circuit (1) • X-Talk Switching (1) • Interface Board Circuit (1) Evan Laske – Exit Presentation – Summer 2010

  35. Exploration Habitation A Sustainable Flexible Path • Lunar Missions • lunar orbit, lunar surface • Landing systems • Nuclear power • In-situ resource utilization • Surface Habitation • Autonomous Hab Operations • Surface Electric Rover • Surface EVA mobility • Deep Space (NEO) • Crew support for 360 days (habitat) • Radiation protection (habitat) • Closed-loop life support (habitat) • Deep space propulsion • Cryogenic fluid management • Supportability & maintenance • Autonomous Hab Operations • Earth Analogs • Crew support for 28 - 70 days • Operations Concept Validation • Science & Mission Ops • Autonomous Hab Operations • Hardware/Software Demos • Closed-loop life support • Inflatable Hab Demos • Environmental monitoring • Supportability & Maintenance • Mars Missions Lunar missions (3) plus: • Mars entry & landing systems • Advanced propulsion • Partial-gravity countermeasures Self-Sustaining Habitats • Near-Earth Space lunar orbit, Libration Points • Heavy lift launch • Autonomous Hab Operations • Inflatable Hab Module • Closed-loop life support • Crew support for 20 days • Deep-space propulsion • Radiation protection • Low-Earth Orbit International Space Station • Zero-g research platform • Autonomous Hab Operations • Inflatable Hab Module • Closed-loop life support • Environmental monitoring • Supportability & Maintenance concepts DRAFT – Pre-decisional

  36. Habitat Demonstration Unit Project Vision: • Develop fully autonomous habitation systems that enable human exploration of space. • Develop, integrate, test, and evaluate Habitation Systems that will be utilized as technology pull / testbed and to advance NASA’s understanding of alternative mission architectures, requirements, and operations concepts definition and validation. Mission: • The Habitat Demonstration Unit – Pressurized Excursion Module Configuration will “roll-out” ready to for remote testing on July 1st 2010. LEO Space Habitation Testbed In-Space Transit Habitation • Top-Level Milestones • 2010: 1st Gen HDU1 Excursion Module Demo • 7/2010 HDU1 “Roll-Out”, Rock-yard Dry Run • 8/2010 – 9/2010 Desert RATS Field Analog Test • 2011: 1st Gen HDU1 Core Module Demo • 8/2011 – 9/2011 Desert RATS Field Analog Test • 2012: 2nd Gen HDU2 Module Demo w/ 1st Gen HDU • 8/2012 – 9/2012 Desert RATS Field Analog Test • 2013: 2nd Gen HDU2 Module Demo w/ 1st Gen HDU • 8/2013 – 9/2013 Desert RATS Field Analog Test Planetary Habitation

  37. From PowerPoint to Demo Unit Habitat Demonstration Unit April 2010 June 2009

  38. Light Paper Power Supply Evan Laske – Exit Presentation – Summer 2010

  39. Charge-Amp Circuit Evan Laske – Exit Presentation – Summer 2010

  40. Accel. Board Circuit Evan Laske – Exit Presentation – Summer 2010

  41. X-Talk Circuit Evan Laske – Exit Presentation – Summer 2010

  42. X-Talk Switching Evan Laske – Exit Presentation – Summer 2010

  43. Interface Board Circuit Evan Laske – Exit Presentation – Summer 2010