Metropolitan Council. Environmental Services. Metropolitan Council Energy Update. October 14, 2008 Presented to Environment Committee. By Jason Willett. Why Energy Focus?. Substantial Cost of Operations Rising Rates Preparing for Climate Change Costs & Regulations State Initiative
E N D
Metropolitan Council Environmental Services Metropolitan Council Energy Update October 14, 2008 Presented to Environment Committee By Jason Willett
Why Energy Focus? • Substantial Cost of Operations • Rising Rates • Preparing for Climate Change Costs & Regulations • State Initiative • Energy Independence & Security • Midwest Governor’s Cap & Trade • Renewable Energy Standard
2007 Energy Costs Metro Transit and Environmental Services Divisions Metro Transit BUS LRT Electricity $1,670,355 $1,702,560 * Natural Gas 1,839,684 45,832 Fuel 16,469,860 0 $19,979,899 $1,748,392 TOTAL COST: $21,728,291 MCES Electricity $13,509,612 Fuel Oil 27,049 Natural Gas 2,724,430 MotorVehicle Fuel 570,845 $16,841,937 TOTAL COST: $16,841,937 *$963,441 is for train propulsion.
Council’s Energy Partnerships • Xcel Energy • University of Minnesota • MEPC (Metro Counties) • State Agencies • The Climate Registry • Minnesota Chamber of Commerce
MCES Energy Strategies • Conservation • Renewable Energy Generation • Financial Strategies • Climate Change Regulatory Preparation
ConservationGoal: 15% reduction of purchased (fossil fuel) energy • Process Efficiency Program • 26 studies completed (10-1-08) • 24 studies scheduled (2009) • 11 actions taken • 16,000,000 kwh savings estimated • $1,000,000 savings per year estimated • $5,000,000 of energy improvements budgeted over next 5 years • Energy Management System • Employee Energy Campaign • Work Instruction for Operations Staff • Design Guidelines for Engineering
A. Conservation • 2008 Energy Intern Work • Green House Gas-N2O Emissions • Centrate Treatment @ Metro • Dissolved Oxygen Set Point Optimization & Control Changes • Optimization of Blowers & Sequencing • 2009 Energy Interns (possible) • Greenhouse Gas Modeling • Phosphorus Reduction • Aeration Efficiency Engineering • Emissions Reporting
Conservation • Energy Management System • Accomplishments • Reviewed several vendors’ energy management software and service. • Joined with Transit to send out a request for information. • Developed real time electric energy use reports for Metro, Seneca, and Blue Lake. • Tracking historical use for all wastewater treatment facilities on a monthly basis. • Developed an energy metric that allows us to measure impact of our energy measures at Metro.
Conservation Energy Management System
Conservation Energy Management System Plans • Obtain electric interval meter data for all facilities • Incorporate gas and other utility information into energy reports. • New metering so real time gas and electric information can be displayed. • Incorporate rate models for billing analysis. • Develop energy metrics for other facilities and sub processes. • Develop energy dash boards and reports.
ConservationEmployee Energy Campaign October 2008 – October 2009 • IS will be reconfiguring all 1800 desktop computers to drop into a very low energy state after 60 minutes of inactivity • All printers will be defaulted to print two-sided copies • Employees will be requested to: • Shut down computers when absent from their desks for long periods of time or at the end of the work day • Turn off task lighting when not needed or at the end of the work day • Turn off any additional electrical items (fans) when not needed or at the end of the work day
B. MCES Renewable Generation • Steam Energy Optimization • Heat Recovery Study • Auxiliary Boiler • Alternative Biofilter Humidifier • Steam Trap Maintenance Program • Microturbine Demo Program at Empire • Thermal Recovery at Eagles Point • Biogas Generation & Reuse at Blue Lake • 1,075,000 therms/year at approximate value of $800,000/year
B. MCES Renewable Generation(Contd) • Algae-to-Fuel Research with University of Minnesota • $1m work plan, began on 7/1/08 • $0.5 funding secured from State • MEPC/County Wind Initiative • Xcel/Council Solar Farm Concept • 1-2 MW at Blue Lake Plant • Likely RFP in January
B. MCES Renewable Generation(Contd) • Other Ideas • Energy crop at Empire • Fats, oils, grease extraction for energy • Screenings digestion for biogas • Small hydro at Rosemount or Eagles Point
Metropolitan Energy Policy Coalition (MEPC) Wind Initiative Council joined MEPC on December 2006 • MEPC/RMEB Explore Wind Initiative • 2006/2007: Avant/Lindquist Business Concept • 2007: LCCMR grant $200k for technical fiscal analysis • 2008: Legislative Bill • Clarify local gov’t authorities under CBED • Counties may own, bond and tax for renewable energy • Counties may pre-pay for energy
MEPC Wind Initiative (Continued) • HGA Consultant Team Hired in 2008 • Phase 1 analysis complete in August of 2008 • Concept: develop approximately 10 Megawatt wind farm • Sites in SW Minnesota identified (e.g. Lyon County Landfill) • Shows financial feasibility (with reasonable cost assumptions)
MEPC Wind Initiative (Continued) • Phase 2 Analysis • Execute contract with Stoehl Rieves • Negotiate with utility for power and purchase access • Lyon County decision? • Next: Determine “Coalition of the Willing” (Joint Powers Agreement) • Seek additional legislation (to finance project) • December AMC meeting – decision?
C. Financial Strategies • Peak Control Agreements with Xcel Energy • Hedging Contracts to Stabilize Natural Gas Costs • Carbon Emissions Cost Added to Energy Cost for Future Engineering Options Analyses • Analysis of Wind & Solar Economics • Review of Tariff Options for Lift Stations
C. Financial Strategies(Continued) • Energy Services Agreement withCenterPoint for N.G. Discount • TBD: Accreditation to Minimize Possible Penalties for FBI/Cogeneration • TBD: Review of “Monetization” Possibilities for Emissions Reductions • TBD: Analysis of Break-Even Point on Peak Control Agreements • Possible: Participation (with Chamber of Commerce) in Rate Case(s)
D. Climate Change Regulatory Prep • The Climate Registry • Reporting all 2008 emissions • To be verified in 2009 • Protocol development • MEPC Forum for Administrators: 11/20/08 • Cap & Trade Status
Council Policy? • To frame and focus Council’s energy actions • Conservation: investment directive • Biofuels directive (to support state agriculture) • Renewable energy directive • Energy financial management • Energy budget stabilization goal • Energy in community planning, assistance • Partnerships