An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review Group 177 Overview of RbD Risk Modelling 31 March 2008

  2. RbD Risk Modelling – Background • Purpose • Risk Modelling supported the introduction of RbD (Reconciliation by Difference) in 1998 • Designed to be one of the operational “monitors” of RbD • How • Defined “Risk” as the difference between actual gas bills and those estimated by RbD • Estimated month on month variability of RbD Charges based on assessment of inherent risk factors • Periodic updates were shared with the RbD Sub-Group

  3. Risk Model - Results • Risk Model showed that RbD was less variable than Meter Point Reconciliation • Base model showed variability of +/- 1.3% of allocation • Indicated variation with errors/timing differences included: +/- 2.5% • Predicted variation increased/decreased between updates • Actual variation can be up to 5% of allocation • Last update provided 2002 • Risk Model superseded by RbD Feeder Model and RbD Forecasting

  4. Review Group 177 Variability of SOQs 31 March 2008

  5. Variability of SOQs • SOQ = AQ PLF * 365 • PLF = Peak Load Factor • Measure of peakiness of annual demand in an EUC – what proportion of AQ would be used on a 1 in 20 peak day • Set each year for each EUC as part of NDM Capacity Algorithms • Determination of PLF • EUCs 1 to 4: determined directly from the NDM Modelling – extrapolating modelled demand to the 78 year 1 in 20 CWV • EUCs 5 to 9: determined from the NDM Modelling using a Weather Correction Factor derived from the DNs forecast 1 in 20 Peak

  6. Variability of PLFs Gas Year 05 to 06 “B” band EUCs only – excludes WAR bands

  7. Variability of PLFs Gas Year 06 to 07 “B” band EUCs only – excludes WAR bands

  8. Variability of PLFs 2006/07 to 2007/08 • WAR Band variability • Gas year 05 to 06 – 100% of WAR Band PLFs changes in range -3% to +3% • Gas year 06 to 07 – 96% of WAR Band PLFs changes in range -3% to +3%

  9. SOQ Amendment Options • PLFs are available by end of August (latest) for coming Gas Year, following industry consultation • Under rolling AQ rules, AQ may have recently updated • Options for NDM SOQs: • Restate all SOQs on 1 October, regardless of recent AQ changes • Leave SOQ unchanged, will update at next AQ change • Update SOQs based on read frequency – only amend Annually Read sites – Monthly Read will get reads and update soon • Update SOQs based on read history – if reads are frequent and AQ updates regularly, don’t update SOQ • Considerations: • Shipper comparability, differing read performance, Transportation revenue/costs, system processing, system capacity requirements