An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9th Meeting of Greek Mobility Centers Network Patras 21 March 2006 Action Plan of Greek Network 2006

  2. Working group “Annual conference”: A. Saitakis (FORTH-PRAXIS) Workshop on on “Cooperation with policy makers”: D. Sanopoulos (CERTH) Workshop on legal issues suggestions for discussants and subjects: 1 participant from UPat (to be confirmed) Workshop on legal issues, case studies: A. Sigala (NHRF), 1 participant from UPat Experts Meeting for the European Mobility Portal: Z. Kiparissides (CERTH) Training Session “Extranet”: D. Sanopoulos (CERTH) Workshop “Industry”: A. Saitakis (FORTH-PRAXIS) Workshop “Communication”: D. Sanopoulos (CERTH) Working group “Quality”: E. Michelidaki (UoC), D. Sanopoulos (CERTH) Working group “Extranet”: D. Sanopoulos (CERTH) Training session “Evaluation”: A. Tsiligeridis (CERTH) BHO meetings (3): D. Sanopoulos (CERTH) 1. Participation inERA-MORE animation activities

  3. Extranet and other tools of the everyday work of the staff of Greek MoCs (Volos, 3 Apr. 2006) TRESS Network(June 2006, Athens) On demand training session on legal issues (June 2006, Athens) Training Sessions in Greece during 2006

  4. Working Groups • Legal issues • Intersectorial Mobility • Newsletter • Survey for the foreign researchers needs • Survey for MCF • Monitoring Charter & Code dissemination (questionnaire, report Dec. 2006)

  5. A. EUROPEAN LEVEL Common Identity and Message – Need for a Corporate Identity of ERA-MORE: 1. Common template to be used for all publications (suggestion from commission later this year) 2. Common slogan B. NATIONAL LEVEL 1. Researchers Night (Sept. 2006) 2. Workshop of “legal issues” and on “relations with ministries” in the frame of the Greek-French cooperation initiative 3. Network presentation in press 4. National mobility info-day (Oct. – Nov. 2006) 5. TV, Radio (info-spots, promotion of events at the news) 6. Preparation of new leaflets 7. Dissemination of the Greek Guide C. LOCAL LEVEL 1. Regional events (Patras, Xanthi) 2. Info-Days 3. Local Press 4. Dissemination of promotional material REPORTING TO BHO TILL 14TH APRIL 2006 Promotion of the Portal and the Network

  6. TARGETS AFTER “PYTHEAS” PROJECT IMPLEMENTATION CERTH: Two Part-time permanent Staff: 50% One external collaborator Part-time: 30% Travel expenses Promotional material Events Consumables Other expenses AUTH, DUTH, UTH, UOP, UOC, NHRF, FORTH: One Part-time Staff member: 70% Consumables SBEE: 1.000,00 – 2.000,00 €/Year Network viability

  7. POSSIBLE FUNDING SOURSES EC funds European level activities like participation in the annual conference, training sessions, workshops, promotional material, etc. GSRT Other sources (e.g. Greek-French research bilateral cooperation initiative, other EC projects) Self funding Viability of the Network

  8. D1.1: Five Year strategic plan due to 36th month. D2.5: The National Mobility Network Library due to 30th month. D7.2: A report containing the evaluation on the awareness campaign due to 36th month. D8.1: Performance indicators report due to 36th month. Deliverables of PYTHEAS project

  9. Provide assistance to mobile researchers Collaboration with other networks Job postings Mapping exercises and Commitment of quality Other activities