1 / 24

Test Liquid Handling Before and After Containment Sump and Spill Bucket Hydrostatic Testing

Test Liquid Handling Before and After Containment Sump and Spill Bucket Hydrostatic Testing. Edward S. Kubinsky Jr. CROMPCO, LLC Director of Regulatory Affairs, Training and Certification ed.kubinsky@crompco.com ASTSWMO UST Workshop Louisville, KY 05/24/2017.

lnease
Download Presentation

Test Liquid Handling Before and After Containment Sump and Spill Bucket Hydrostatic Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test Liquid Handling Before and After Containment Sump and Spill Bucket Hydrostatic Testing Edward S. Kubinsky Jr. CROMPCO, LLC Director of Regulatory Affairs, Training and Certification ed.kubinsky@crompco.com ASTSWMO UST Workshop Louisville, KY 05/24/2017

  2. Crompco Hydro Testing Solution – “Water Wagons”

  3. Crompco Hydro Testing Solution – “Water Wagons”

  4. Crompco Hydro Testing Solution – “Water Wagons”

  5. Crompco Hydro Testing Solution – Potable Water at Yard for Quick Water Wagon Filling With Clean Water

  6. Crompco Hydro Testing Solution – 5,000 Gallon “dirty water” Trailer Used for Water Storage for Disposal

  7. Full Hydrostatic Testing Performed on 05/08/2017 (Buckets, Sumps, UDC’s) • Test water was approximately 3-4 weeks old. • Owner of the site “owns” the water used for testing and handles disposal costs. • Water is used only at this customer’s sites.

  8. Started Job w/ Hydro Test of All Spill Buckets

  9. Then Started STP Sumps

  10. Testing being performed

  11. Time to Move to the UDC’s

  12. Testing being performed

  13. Time to Vac it Out

  14. Questions/Comments?

More Related