20 likes | 113 Views
News from CMWG. CTC, 01.2009. News and actions. Cost exercise (pilot) with new template by feb 2009
E N D
News from CMWG CTC, 01.2009
News and actions • Cost exercise (pilot) with new template by feb 2009 • Meeting on 08.12: presentation from F. PEAUGER on ACS with WFM (kick-off meeting for CLIC-CEA collaboration, Exceptional contribution of France) – started design of WFM for damped disk structure CLIC G • Test module in CLEX (FP7, WP9.2/3): kick-off (WebEx) meeting on 26.01.2009 • Objectives for 2009 • Definition of test module • Design of interconnections with TE/VSC • Design of supporting system with BE/ABP and other groups and collaborators involved • Detailed design for cooling system • Mathematical model (FEM) for the whole module considering all main components and operation conditions • Definition of baseline for transport and installation strategy with CESWG and BE/ABP