PNW R oof T op U nit Working G roup - RTUG – Regional RTU Savings Research presentation to PNW Regional Technical Forum January 5, 2010. RTUG Jan 2010. RTUG Report to RTF. Summary: Regional RTU Energy Efficiency Initiatives Initial Results from the Bonneville RTU project
E N D
PNW RoofTop Unit Working Group - RTUG –Regional RTU Savings Researchpresentation toPNW Regional Technical ForumJanuary 5, 2010 RTUG Jan 2010
RTUG Report to RTF • Summary: Regional RTU Energy Efficiency Initiatives • Initial Results from the Bonneville RTU project • Regional RTU Research Results • Provisional Deemed Savings Value Framework • Regional Results Database • Next Steps
RTUG Membership • Dave Baylon Ecotope • Alan Budman Snohomish County PUD • Jack Callahan Bonneville Power Administration • Jeff Cole RTF & Better Bricks Advisor • Bob Davis Ecotope • Karen des Portland Energy Conservation, Inc. • Laura Feinstein Puget Sound Energy • Fred Gordon Energy Trust of Oregon • Reid Hart Portland Energy Conservation, Inc. • Chris Helmers PacifiCorp • Glenn Hensen Portland Energy Conservation, Inc. • Kathy Hile Cadmus Group • Mark Jerome RTF (Pacific Air Comfort) • Mike Kennedy Ecotope Bill Koran Quantum • Will Miller Lockheed Martin • Mike Little Seattle City Light • Tom Lienhard Avista Utilities • Mike Lubliner WSU Energy Program
RTUG Membership • Peter Meyer Tacoma Public Utilities • David Davis Idaho Power Company • Nick O'Neill Energy Trust of Oregon • Steve Ottenbreit Snohomish County PUD • Janice Peterson NW Energy Efficiency Alliance • Jon Powell Avista Utilities • Stan Price Northwest Energy Efficiency Council • Will Price EWEB • Dave Robison Stellar Processes • Erin Rowe PECI • Joe Schmultzer Puget Sound Energy • Mira Vowles Bonneville Power Administration • Greta Zink Avista Utilities • Brian Van Buskirk Portland Energy Conservation, Inc. • John Palmer-Williams Tacoma Public Utilities • Out-of-Region representatives from NEEP- NYSERDA/VEIC, CA- BBI/ SCE/WCEC
PNW RTU Market Size [2006] • 320,000 units 5-ton predominates • 27,000 new units annually • 16,000+ replacement • 11,000+ in new construction STATE SHARES WA @ 41% OR @ 39% ID @ 12% MT @ 8%
Savings in MWa 2029 – 6th Power Plan TRC Levelized Cost: Mostly $10 to $50 per MWh
PNW RTU 2008-09 Count 236 Metered • Avista = 12 side-by-side metered [4 in place] • Bonneville Power Administration RTU Pilots = 161 metered • Energy Trust of Oregon = 94 serviced/13 metered • Idaho Power = 9 metered • Puget Sound Energy = 41 metered
Related RTU Activities • Northwest Energy Efficiency Alliance • HVAC contractor training • Regionwide RTU program support • Emerging Technology program • Bonneville Power Administration • HVAC Emerging Technologies • Premium Ventilation Package • R&D • California Activities – Western HVAC Performance Alliance – CEC PIER RTU FDD – HVAC EM&V Results
RTU Reality TV: ETO BAU Site Sample • 3 HVAC units with economizers, 1 functional; 2 units did not have 2-stage controls • Outside ventilation was disabled on 2 of 3 units • None of the businesses had appropriate scheduling of HVAC • Noticeable air leaks around roof curbs
2009 RTU Savings Results What We Know - 2 Bonneville ETO Idaho Power PSE
Why? Programmatically simple Supported by research to date Enables Bonneville to gather more data to inform regional program Low risk (< 0.05 aMW) True up based on: Annual metering of 54 RTUs [BPA-Idaho] Summer of 2010 RTU data Continued monitoring for persistence? RTU Service Provisional Deemed Savings Value
Regional Results Database • Results from all programs will be entered • Primary structure a directory tree with each program results as a separate directory • Each directory: unit raw data template + results summary for each unit + site/unit characteristics & service measures • Summary data will include selected site/unit characteristics • Potential integration with other regional databases
Database Summary View Site Summary Pre- and Post- Service Summary Fan kW Fan duty (frac of full load) Baseload kWh/day Balance point temp Slope kWh/day/degF Demand @ 80 deg F, Stage 1&2 kW Compressor trigger degF • Site ID • RTU ID • Weather data • Annual kWh pre • Annual kWh post • Compressor stages • Compressor max duty (frac of full load) • Economizer (y/n) • Monitoring level
2009 PNW RTU Outcomes • Critical Body of Knowledge being assembled • Measurement & analysis continuing • Results database being established for additional analysis • Provisional Deemed Savings Potential
RTUG Next Steps - 2010 • Field Protocol/Provisional Savings meeting > January 19 • Recommendations to RTF > February 2 • Bonneville Pilot Development > February-May • Establish results database; final design review by RTUG, RTF, others > January-March • Continue to review Bonneville and other in-region and out-of-region sources of data analysis/results > Ongoing • Identify additional analyses > January-September • 12-month data analysis > June-September