1 / 86

I . Belošević, M . Ivić, M . Marković, S . Vesković, N . Pavlović, S . Milinković, M . Kosijer

19 th International Symposium EURO – ŽEL 2011 ‘’Recent challenges for European railways’’. ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS FORMING PROCESS USING THE SIMULTANEoUS METHOD.

lok
Download Presentation

I . Belošević, M . Ivić, M . Marković, S . Vesković, N . Pavlović, S . Milinković, M . Kosijer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 19th International Symposium EURO –ŽEL 2011 ‘’Recent challenges for European railways’’ ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS FORMING PROCESS USING THE SIMULTANEoUS METHOD I.Belošević, M.Ivić, M.Marković, S.Vesković, N.Pavlović, S.Milinković, M.Kosijer University of Belgrade, Serbia 8th – 9 th JuneŽilina,Slovak Republic

  2. What are pick - up trains? • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION

  3. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  4. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  5. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  6. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  7. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  8. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  9. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  10. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  11. What are pick - up trains? TRAIN D C B TECHNICAL FREIGHT YARD TECHNICAL FREIGHT YARD INTERMEDIATE STATION • Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations • Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

  12. Principal of Simultaneous method CLASSIFICATION YARD RECEIVING YARD Marshalling Yard

  13. RECEIVING YARD 7 8 6 4 5 2 5 4 3 1 2 Pushing onto the hump 7 lok. 8 9 3 1 6 2 1 6 5 3 4 8 7

  14. RECEIVING YARD 7 8 6 4 5 2 5 4 3 1 2 Pushing onto the hump 7 lok. 8 9 3 1 6 2 1 6 5 3 4 8 7

  15. RECEIVING YARD 7 8 6 4 5 2 5 4 3 1 2 2 Pushing onto the hump 7 1 6 lok. 8 9 3 1 6 5 3 4 8 7

  16. - The First Phase - 7 1 6 2 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 8th Gravity shunting CLASSIFICATION YARD Sorting tracks for final forming of trains

  17. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 6 2 8th Gravity shunting CLASSIFICATION YARD 7 3 1 Sorting tracks for final forming of trains

  18. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 1 7 3 6 2 8th Gravity shunting CLASSIFICATION YARD lok. 8 9 Sorting tracks for final forming of trains

  19. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 6 2 9 4th 1 7 3 8th Gravity shunting 8 CLASSIFICATION YARD lok. Sorting tracks for final forming of trains

  20. 1 4 8 7 - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 9 3 6 7 2 1 8th Gravity shunting 8 CLASSIFICATION YARD Sorting tracks for final forming of trains

  21. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 7 2nd, 6th 4th 4 9 3 6 7 1 2 8th Gravity shunting 8 8 CLASSIFICATION YARD 1 6 5 3 lok. Sorting tracks for final forming of trains

  22. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 7 1 2nd, 6th 3 4th 5 4 9 3 6 7 1 2 8th Gravity shunting 8 8 6 CLASSIFICATION YARD lok. Sorting tracks for final forming of trains

  23. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 4 9 5 3 6 3 7 8 1 6 2 8 1 7 8th Gravity shunting CLASSIFICATION YARD Sorting tracks for final forming of trains

  24. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 4 9 5 7 3 3 6 2 7 1 4 8 6 2 7 1 1 8 8th Gravity shunting CLASSIFICATION YARD Sorting tracks for final forming of trains

  25. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 1 4th 4 4 5 9 6 3 3 1 8 6 7 8 2 7 1 8th Gravity shunting 2 CLASSIFICATION YARD lok. 7 6 4 Sorting tracks for final forming of trains

  26. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 1 2nd, 6th 7 2 4th 4 4 4 5 9 3 6 3 7 6 8 1 7 1 8 2 8th Gravity shunting 6 CLASSIFICATION YARD lok. Sorting tracks for final forming of trains

  27. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 9 5 4 3 6 3 7 6 8 1 6 4 7 8 2 2 4 1 7 1 8th Gravity shunting CLASSIFICATION YARD Sorting tracks for final forming of trains

  28. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 8 9 5 5 6 3 4 3 5 3 6 8 7 6 4 1 7 2 1 7 1 8 2 4 2 8th Gravity shunting CLASSIFICATION YARD Sorting tracks for final forming of trains

  29. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2 3 2nd, 6th 5 4th 5 9 4 3 3 6 8 7 6 6 4 1 7 1 2 8 7 4 2 1 8th Gravity shunting CLASSIFICATION YARD 8 5 lok. Sorting tracks for final forming of trains

  30. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 3 5 2nd, 6th 2 4th 5 9 4 3 3 6 8 7 6 6 4 1 7 1 8 1 7 4 2 2 8th Gravity shunting 8 5 CLASSIFICATION YARD lok. Sorting tracks for final forming of trains

  31. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 9 5 6 5 4 3 8 2 3 4 1 5 7 6 6 8 7 3 2 2 1 4 8 1 7 8th Gravity shunting CLASSIFICATION YARD lok. Sorting tracks for final forming of trains

  32. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th 9 5 4 5 2 8 3 3 6 7 6 8 1 7 6 4 5 8 4 3 1 2 7 1 2 8th CLASSIFICATION YARD lok. Sorting tracks for final forming of trains 32

  33. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th lok. 4th 9 5 3 3 6 5 4 2 8 8 6 6 5 4 1 7 7 8 4 3 1 2 7 1 2 8th CLASSIFICATION YARD Sorting tracks for final forming of trains 33

  34. 7 lok. - The First Phase - 1st, 3rd, 5th, 7th, 9th 1 Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th Shunting onto the hump 9 5 3 3 2 6 8 5 4 4 7 1 5 6 6 8 4 1 3 8 2 7 2 8th CLASSIFICATION YARD Sorting tracks for final forming of trains 34

  35. lok. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th Shunting onto the hump 9 5 8 3 3 2 5 4 6 6 7 1 4 8 5 7 6 4 8 1 2 3 7 1 2 8th CLASSIFICATION YARD Sorting tracks for final forming of trains 35

  36. lok. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th Shunting onto the hump 9 5 8 3 3 2 5 4 6 6 7 1 4 8 5 7 6 4 8 1 2 3 7 1 2 8th CLASSIFICATION YARD Sorting tracks for final forming of trains 36

  37. - The First Phase - 1st, 3rd, 5th, 7th, 9th Sorting tracks for wagons accumulation by intermediate station 2nd, 6th 4th Shunting onto the hump 9 6 4 2 3 8 6 4 7 8 6 2 4 1 2 8 8th CLASSIFICATION YARD Sorting tracks for final forming of trains 37

  38. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 4th, 5th 3 5 6 3 8 4 2 6 8 4 1 6 2 7 8 4 2 8th, 9th Gravity shunting 9 CLASSIFICATION YARD 1 Sorting tracks for final forming of trains 38

  39. 7 lok. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 5 3 4th, 5th 8 2 6 5 4 8 5 6 6 4 3 2 2 8 4 8th, 9th Gravity shunting 9 CLASSIFICATION YARD 1 1 Sorting tracks for final forming of trains 1 39

  40. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 3 7 3 4th, 5th 5 5 5 2 6 8 4 6 6 4 8 4 2 8 2 8th, 9th Gravity shunting 9 CLASSIFICATION YARD lok. 1 1 Sorting tracks for final forming of trains 1 40

  41. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 4th, 5th 3 2 6 5 8 4 6 6 4 8 5 7 4 2 2 3 5 8 8th, 9th 9 CLASSIFICATION YARD lok. 1 1 Sorting tracks for final forming of trains 1 41

  42. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 4th, 5th 4 8 5 6 2 3 6 6 4 5 7 8 4 2 2 3 5 8 8th, 9th 9 CLASSIFICATION YARD lok. 1 1 Sorting tracks for final forming of trains 1 42

  43. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 lok. 4th, 5th 3 6 5 4 8 2 7 6 4 8 6 5 2 3 5 8 4 2 8th, 9th 9 CLASSIFICATION YARD 1 1 Sorting tracks for final forming of trains 1 43

  44. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th lok. 7 3 7 4th, 5th Shunting onto the hump 6 5 4 2 3 8 5 7 4 8 6 6 3 2 4 5 2 8 8th, 9th 9 CLASSIFICATION YARD 1 1 Sorting tracks for final forming of trains 1 44

  45. lok. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 7 3 7 4th, 5th Shunting onto the hump 6 2 8 4 5 3 4 8 7 6 6 5 3 8 4 2 2 5 8th, 9th 9 CLASSIFICATION YARD 1 1 Sorting tracks for final forming of trains 1 45

  46. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 4th, 5th Shunting onto the hump 6 8 5 2 4 6 6 5 4 8 5 4 8 2 2 8th, 9th 9 CLASSIFICATION YARD 7 3 7 3 7 1 1 Sorting tracks for final forming of trains 1 46

  47. - The Second Phase - Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th 4th, 5th Shunting onto the hump 6 4 8 5 5 6 4 8 2 5 8 4 8th, 9th 9 CLASSIFICATION YARD 1 1 Sorting tracks for final forming of trains 1 47

  48. - The Third Phase - Sorting tracks for wagons accumulation by intermediate station 6 6 4th, 5th , 6th , 7th 8 2 5 4 4 6 5 8 5 2 8 4 8th, 9th 9 Gravity shunting CLASSIFICATION YARD 1 2 1 Sorting tracks for final forming of trains 1 48

  49. - The Third Phase - Sorting tracks for wagons accumulation by intermediate station 4th, 5th , 6th , 7th 6 6 6 8 4 5 5 4 8 8 4 5 8th, 9th 9 Gravity shunting CLASSIFICATION YARD 7 3 7 2 1 2 2 1 Sorting tracks for final forming of trains 1 49

  50. - The Third Phase - Sorting tracks for wagons accumulation by intermediate station 4th, 5th , 6th , 7th 7 4 3 8 6 5 7 6 5 8 4 6 5 3 4 8 8th, 9th 9 Gravity shunting 7 CLASSIFICATION YARD lok. 1 2 1 2 3 Sorting tracks for final forming of trains 1 2 50