260 likes | 505 Views
2. JBD2 JTEM 08 Lessons Learned Test Integration/Test Management. . . Background OV-1 Sites Test Design Lessons Learned Site Survey Networks Communications Personnel Applications Misc Spiral Integrations Future Recommendations. OUTLINE. JBD2 JTEM 08 Test Event Background and Ra
E N D
6. Feedback from CTM evaluation efforts during planning and preparations for FY07 Test Event #1 indicated a need to ensure the Joint Operational Context for Test (JOC-T) is developed and described in a Test and Evaluation Master Plan (TEMP)?
The JOC-T, the Capability/SoS Description, and the Evaluation Strategy Outline would then set the stage for the test characterization and “feed” the development of the Program Introduction Document (PID) and Statement of Capabilities (SOC)?Feedback from CTM evaluation efforts during planning and preparations for FY07 Test Event #1 indicated a need to ensure the Joint Operational Context for Test (JOC-T) is developed and described in a Test and Evaluation Master Plan (TEMP)?
The JOC-T, the Capability/SoS Description, and the Evaluation Strategy Outline would then set the stage for the test characterization and “feed” the development of the Program Introduction Document (PID) and Statement of Capabilities (SOC)?
9. AF ICE: Air Force Integrated Collaborative Environment (ICE).
JSIC: Joint Systems Integration Command
JMETC: Joint Military Environment Test Capability
AF ICE: Air Force Integrated Collaborative Environment (ICE).
JSIC: Joint Systems Integration Command
JMETC: Joint Military Environment Test Capability