Network Inventory Conceptual Framework Tony Breach, Optical Network Manager 9. september 2014
Network Inventory - Index Project Manager Objective Requirements Supplier Inv. and Analysis Decision making basis Project Timeline
Project Manager • Project Manager: Heino Radmer • Project Team • Heino Radmer • Sören Westerberg • NU-NOC Member • Members that contribute to this project • Lars Bjørn • Mick Krag
BOL Objective • Base Objective • Topology – Physical/Logical • Hardware – Active/Passive • Connectivity – Fibers/Cables/Wireless • Sites • Software/Firmware Versions
End Objective • Device and physical network topology – including automatically device topology discovery • Software and firmware package management • Real time End to End Logical topology including logical end user connection representation • Device diagnostic log for tracking of degeneration in hardware components • Network Resource Management • Device, card, port utilization for maintenance and network planning • End to end logical utilization • Dynamical interaction with the Service Assurance and Provisioning engine • Simulation and planning tools
Requirements • BOL System • Data container will be Excel to MYSQL • How to access and Query – via Excel • End System • Data container MYSQL • How to access and Query – Web based GUI • GUI, Query, Presentation • TB – Web based GUI, Table and graphic presentation of Circuits etc. Possible for open queries • Data Structure • Based on Heino’s Network Inventory Structure • Synchronisation of Data with Live Network • Automatic, Semi Automatic, Manual
Supplier Investigation and Analysis • Alcatel-Lucent • Workshop • Investigate the supplier market for NI’s • Look for co-operational NI’s to Service Assurance Systems
Decision Making Basis • Project Objective, • Project description • Benefits for NN • Price • Resources internal/external • Implementation • Timeline • Operation Responsibility
Timeline • Project start 01-03-2007 • Vendor Workshop and presentations week 11 • Decision Making Basis week 12 • Installation Start Base System 01-05-2007 • Project end Base System 01-07-2007 • KPI’s • NN Transmission 100% ready date 01-07-2007 • NN IP 75% ready date 01-07-2007 • SUNET Transmission 80% ready date 01-07-2007 • SUNET IP 50% ready date 01-07-2007