1 / 25

Basel II Update

Basel II Update. Dubrovnik, 27-28 May 2004. Charles Freeland Deputy Secretary General. Future schedule. Parallel running and floors. The floor is expressed as a percentage of the bank's capital requirement under Basel I

lorant
Download Presentation

Basel II Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Basel II Update Dubrovnik, 27-28 May 2004 Charles Freeland Deputy Secretary General

  2. Future schedule

  3. Parallel running and floors The floor is expressed as a percentage of the bank's capital requirement under Basel I There is a possibility that further testing (QIS) will result in the need for recalibration or a scaling factor

  4. IRB issues resolved this month 1. Securitisation simplified • Same treatment for originating and investing banks • Internal Assessment Approaches permitted 2. Credit cards resolved • One single default correlation factor • Treatment of securitised credit card receivables 3. Stress LGDs to be consulted on further • One single calculation required

  5. The Madrid "breakthrough" • The BCBS had previously decided to calibrate IRB against expected plus unexpected losses (EL + UL) • The reason was essentially a lack of uniformity in national provisioning rules and accounting rules • In Madrid, the BCBS decided to respond to industry requests to calibrate IRB to UL only • In addition, a calculation of EL will be made by each IRB bank and the numerator of the ratio will be adjusted accordingly

  6. Adjustment to the numerator • General provisions will be removed from the numerator for IRB banks • EL will be compared with the sum of general plus specific provisions for the portfolios in question • If provisions < EL, the deficiency will be deducted 50% from Tier 1 and 50% from Tier 2 • If provisions > EL, the excess will be added to Tier 2 (to a limit of 0-6% of risk-weighted assets at national discretion)

  7. Why did we correct EL/UL? • It is how the banks calibrate their IRB • The new proposal: • Is conceptually purer • Simplifies the framework • Recognises different provisioning practices in different jurisdictions • Accountants continue to insist on "incurred losses“ but they acknowledge "experienced credit judgement"

  8. Position of non-BCBS/EU member countries • Australia, Hong Kong, Singapore and South Africa will be ready by 2006 • Brazil, Chile, Malaysia, Mexico may be a bit slower • China and India have NOT rejected Basel II (their opinions are public) • China have already introduced Pillars 2 and 3 but will wait for an appropriate time to adopt Pillar 1 • India is now introducing market risk and intends to adopt Basel II subject to some local adjustments

  9. Simple standardised approach (Annex 9) • Establish sovereign risk weights - assuming no external ratings, export credit agency scores established by the OECD are a sound alternative • Banks and regulated securities firms get one risk weight worse than the sovereign (i.e. 50% if sovereign is 20%) • New risk buckets for mortgages (35%) and retail (75%) • 150% weighting band for past due loans • Conversion factor for undrawn commitments up to one year raised to 20% of principal (from zero) • Operational risk charge (15% of gross income)

  10. OECD Export Credit classifications (April 2004)

  11. Assistance for countries proposing to implement Basel II • BCBS has established an Accord Implementation Group • AIG has already conducted extensive fact-finding/ information-sharing • FSI is planning intensive training programmes (e-learning project) • IMF/WB technical assistance programmes • Private sector consultants

  12. "Practical considerations" circulated to supervisors (August 2003) • Basel II should not take precedence over other supervisory priorities such as the implementation of the Basel Core Principles • Countries need to decide soon what banks or set of banks should move to Basel II and when • Commence national legislative/regulatory processes • Strengthen supervisory resources and training

  13. High-level Principles for crossborder implementation (August 2003) • Legal responsibilities of supervisors will not change • The home supervisor of a banking group is responsible for oversight of implementation on a consolidated basis • Host supervisors, particularly of subsidiaries, have requirements that need to be understood and recognised • There will need to be enhanced cooperation between supervisors, led by the home supervisor • Where possible, supervisors should avoid performing uncoordinated approval and validation work • Supervisors should communicate the rules of home and host supervisors to banking groups operating in multiple jurisdictions About 20 case studies now in train - if you have questions, contact the home supervisor not the bank

  14. The level playing field!

  15. Eligible capital ON-BALANCE-SHEET CREDIT RISK + Off-balance-sheet credit risk + Market risk + OPERATIONAL RISK Four out of six parameters basically unchanged = 8% Pillar 1

  16. Pillar 1 Key changes: • Wider spectrum of credit risk weights • Greater recognition of collateral • More refined treatment of securitisation • Charge for operational risk introduced • Undrawn commitments weighted at 20% of principal

  17. Standardised Approach – Risk Weights 1Risk weighting based on risk weights of sovereign in which the bank is incorporated, but one category less favourable. 2 Risk weighting based on the assessment of the individual bank. 3 Claims on banks of an original maturity of less than three months generally receive a weighting that is one category more favourable than theusual risk weight on the bank’s claim.

  18. Standardised ApproachRisk weights for individuals and corporates

  19. Historical Default Rates • Main reason for using ECAIs: increases the risk sensitivity • High correlation between ratings and default rates S&Ps PD over 5-year horizon

  20. 8% (current Accord) Capital Charge under SA versus other measures

  21. Operational risk Op risk is growing, both from unexpected external events and internal problems (ie “friendly fire”) Choice of three approaches proposed: • Basic indicator (15% of average gross income over 3 years) • Standardised approach (based on separate scaling factors for gross income from defined business lines) between 12% and 18% of gross income • A range of advanced methods based on loss experience, subject to addition risk control criteria

  22. Pillars 2 and 3 • Critical to the “balance” of the proposal • Pillar 2 (Supervisory review) includes attention to risk management generally, including: • Concentration risk • Interest rate risk • Collateral management risk • Pillar 3 (disclosure) is designed to enforce market discipline

  23. The challenge for banks and supervisors Initial phase • Determine approach to be used • Revise legislation/administrative guidance (e.g. EU Directives) • Draw up reporting forms/guidance notes • Train staff for implementation Ongoing • Activate Pillar 2 • Review standards for IRB banks

  24. What are the basic aims of Basel II? • To deliver a prudent amount of capital in relation to the risk that is run • To provide the right incentives for sound risk management • Basel II is not intended to be neutral between different banks/different exposures • However, there is a desire not to change the overall amount of capital in the system

  25. Keep an eye on BCBS website www.bis.org/BCBS

More Related