An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quality Tools Diana Howard ASQ CA/RABQSA

  2. 1.Poka – Yoke a. Heat sink example2. Four Up Charts 3. Lean Sigma a. Value Stream Mapping 4. Resources Topics of Discussion

  3. What is Poka-Yoke? • The phrase Poka-Yoke originates from the Japanese words: yokeru = to avoid poka = inadvertent errors • It is a methodology that is used to strive toward zero defects by either preventing or automatically detecting defects.

  4. Guide/Reference/Interference Rod or Pin: Template: Limit Switch/Microswitch: Counter: Odd Part Out Method: Mistake Proofing Devices

  5. Sequence Restriction: Standardize and Solve: Critical Condition Indicator: Detect Delivery Chute: Stopper/Gate: Sensor: Mistake Proofing Devices (p. 2)

  6. Other Prevention Techniques • Eliminate the Condition • This method isolates the specific characteristic and removes it. For example: Certain non-functional holes cause confusion about where to insert parts during assembly. We simply plug the non-functional holes and eliminate any possibility that they might be used and cause errors. • Redesign for Symmetry • Redesign for symmetry means to revise or modify the appearance or function of a part, tool or fixture so that its opposite sides are identical or nearly identical. In this way they become interchangeable. • Redesign for Asymmetry • This involves revising or modifying the appearance or function of a part, tool or fixture so that its opposite sides are no longer identical. In this way they can no longer be confused and mistakenly interchanged. This is especially useful when a particular orientation is critical.

  7. Four – Ups charts • Used for Reporting to management • Graph of measurement over time • Analysis of quarterly data • Issues/causes • Action Items

  8. Pre-Ship Acceptance • Great improvement! • Customer intro during quarter( XXXXX volumes ramped during qtr) • Hardware Missing: XXXXXX 9131-0031-0004 Screws • PDC: Misc customers and locations. • Missing: No Common locations or assemblies. • Hardware Missing: Developed UV/black light marker check. Operator to use pen and “Touch for Quality” - QA to audit with black light. Due date: 2/3/06 • PDC: 10 different refdes locations across 8 different assemblies. No common trend. • Missing: Nozzle replacement program instituted and refresher on operator training.

  9. Lean Sigma – The combination • Rationale for combined approach • History with concepts since 1996 • Independent successes • Amplified by using both together • Industry trends toward Operational Excellence • The Lean Sigma philosophy: • Utilizes the DMAIC approach • Incorporates Toolsets from both • Guide to faster solution • Maintains accuracy • Provides standardization and improves control 15

  10. Lean Sigma

  11. What is Value Stream Mapping? A tool used to create a material and information flow of a product or process The value stream includes the following: People Tools Technologies Physical facilities Material and Information flows Policies and procedures

  12. Why Value Stream Maps? It helps visualize what may be otherwise un-seen Find the sources of waste and quantifies those wastes so that efforts for reduction can be prioritized

  13. Target Waste with Value Stream Maps Lean Manufacturing / Enterprise Long Setup – Apply lean tools (SMED) to reduce set up time Excess Inventory – Apply line balancing (Lean) and Kanban to reduce or eliminate inventory Non-Value Add Value Add

  14. Summary • Poka Yoke “Make it fool proof” • 4-Ups Picture representation for Management • Combine Lean and Six Sigma to reduce lead time, increase productivity,reduce WIP, better utilize space.

  15. Resources http:isixsigma.com http://en.wikipedia.org Sasa Todorovic Quality Engineer, Black Belt Master “Learning to See” by Mike Rother and John Shook Available at www.lean.org