480 likes | 651 Views
SUPERVISORY CONTROL & DATA ACQUISITION SYSTEM. Example. Example.
E N D
Example • Western Mining's Olympic Dam site which is one of the largest Citect SCADA installations (it used to be the largest installation in the world).. Olympic Dam is a 200,000 tpa Copper/Uranium mine. The site consists a 5 distinct plants1) underground mine (10 Mtpa)2) concentrator3) hydrometallurgical circuit4) smelter5) refinery • There is a single Citect front-end across the entire site, ie. all 5 plants and auxiliaries such as borefield water supply (via telemetry), compressed air supply and power distribution system. We run a single cluster of redundant servers (10 IO, 2 Trend, 2 Alarm, 2 Report, 16 total) which support 57 full time clients, 12 engineering workstations and 20 floating manager nodes (running on a terminal service which services about 100 regular users).