An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The JPARC Neutrino Target Y.Hayato (ICRR, Univ. of Tokyo) for T.Nakadaira & J-PARC n beam-line construction group (I borrowed most of all the transparencies from Nakadaira-san)

  2. J-PARC neutrino beam line Primary Proton beam line Extraction point Target Target station Bunch structure Decay volume Spill width ~5ms 8 (15) bunches/spill beam dump muon monitor Cycle: 3~4 sec Near neutrino detector Bunch spacing: ~600(300) ns Bunch length: 58ns (Full width)

  3. Accommodate Baffle: Graphite, 32mmf hole x 1.7m long to protect 1st horn Target 3 Horns Area filled with Helium gas reduce Tritium, NOx production Highly radio-activated ~1Sv/h, Need remote-controlled maintenance system Need cooling (Helium vessel, radiation shield,..) Target Station 3rd horn 2nd horn Trg& 1st horn Baffle Target Baffle beam 1st Horn 2nd Horn 3rd Horn

  4. 47.0 46.4 39.6 35.6 26.0 Target dimension • Co-axial 2 layer cooling pipe: Graphite / Ti-6Al-4V,Helium cooling Outer pipe Ti-6Al-4V [mm] Inner pipe IG-43 target IG-43 spacer Sectional area = 4.610-4 [m2] Cooing path f=47mm f=26mm

  5. One design of the target & surrounding cooling pipe (Not the final design). 陽子ビーム He inlet He outlet Ti-6Al-4V Beam window Ti-6Al-4V 陽子ビーム Target Need further design study Graphite IG-43

  6. } To downstream } To downstream Design of inlet and outlet of He Gas is not fixed.

  7. Target cooling : Water or Helium? Advantage Disadvantage

  8. Target : Conceptual design • Core: Isotropic-Graphite : IG-43 (Toyo Tanso Co. Ltd) • Energy deposit… Total: ~40kJ/spill (30GeV) DT  200K. seq = 7.5 [MPa]  Tensile strength = 37.2 [MPa] Distribution of the energy deposit in the target (w/ 1 spill) J/gK degree MARS proton beam cm f=47mm f=26mm

  9. Expected radiation damage of the target The approximation formula used by NuMI target group : 0.25dpa/year MARS simulation : 0.15~0.20 dpa/year Dimension change : shrinkage by ~5mm in length in 5 years at maximum.~75mm in radius Degradation of thermal conductivity … decreased by 97% @ 200 C70~80% @ 400 C Magnitude of the damage strongly depends on the irradiation temperature. It is better to keep the temperature of target around400 ~ 800 C 800oC 400oC Thermal conductivity (After/Before) (dpa) 1 2 3 Irradiation Effect of Graphite 800 1000 400 600 Irradiation Temperature(C) JAERI report (1991) 2dpa -0.5% 1dpa Dimension change Toyo-Tanso Co Ltd. IG-11

  10. Max: ~ 500 C Min: ~ 300 C Max: ~160 C (DT = 135 C) Avg. : ~380 C Avg. : ~40 C FEM simulation of He cooling • Assumptions: 0.19MPaHe Initial temperature: 25 CHe flow rate: 6000 [l/min] 194 [m/sec]Heat convection rate: 820 [W/m2/K] (50GeV,f=15mm) Target Temperature Helium Temperature

  11. 38C ~34C ~102C 25C 160C 395C ~380C ~300C 500C FEM simulation of He cooling (50GeV,f=15mm) • Assumptions: 0.19MPa(Possible pressure drop at the downstream of target is taken into account.) • He Initial temperature: 25 CHe flow rate:6000 [l/min] 194 [m/sec]Heat convection rate:820 [W/m2/K]

  12. fin.