60 likes | 203 Views
RD51 –WG7 Tentative August and October setups. Matteo Alfonsi. August test beam schedule. Start 12 th of August First day of MD.. No problem because of installation 10.5 effective days. Period 2 (August 12 th – 23 rd ). Nikhef gas line. Ne/CH 4 95/5 2 sensors. Goliath.
E N D
RD51 –WG7Tentative Augustand October setups Matteo Alfonsi
August test beam schedule • Start 12th of August • First day of MD.. No problem because of installation • 10.5 effective days M. Alfonsi
Period 2 (August 12th – 23rd) Nikhefgas line Ne/CH4 95/5 2 sensors Goliath Ar/CH4 50/50 2 sensors GEM trackerAveiro/UTA/Weizmann TOTEM Nikhef beam TS Ar/iC4H10 80/20 2 sensors DME/CO2 50/50 2 sensors 3 RD51gas lines: Ar/CO2 70/30 Ar/CO2 80/20 Ne/CH4 95/5 1 RD51gas line: Ar/CO2 70/30 1 SPSgas line Ar/CH4 50/50 No magnet, but several flammable gas M. Alfonsi - CERN
Aveiro/UTA/Weizmann setupwithin CERN table Compatible within CERN table if these dimensions includes the whole envelope with services 80*80 mm^2 window on both sides (only the G10 readout & THEMs are crossed by the beam) 50 mm Data and power cables ~20 cm long 300 mm 200 mm Interface board (might stay outside the box) SHV connectors M. Alfonsi
Problems in October • Big MD at the beginning .. Useful for installation but only 9 effective days for 7 foreseen groups • SPS coordinator wants to put LHCf parassitically in our period: space in the area should be enough, but I see big problems with accesses, beam settings, space in the barrack • Safety requested an updated fringe field map. M. Alfonsi
Conclusions • No major problems in August setup • New Goliath fringe field measurements required for October (possible slot: end of August) • LHCf within October test beam is a major issue M. Alfonsi