Top New Product Initiatives to Close IEC Product Gap

Top New Product Initiatives to Close IEC Product Gap. Plug & Receptacles Interlocked Plug & Receptacle. Interlocked Plug & Receptacle. 16 Amp IEC/NEC Flameproof Switch Eliminate purchasing switches from Stahl & Bartec Key component for global Control Stations,

lucita
Download Presentation

Top New Product Initiatives to Close IEC Product Gap

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Top New Product Initiatives to Close IEC Product Gap

  2. Plug & ReceptaclesInterlocked Plug & Receptacle Interlocked Plug & Receptacle • 16 Amp IEC/NEC Flameproof Switch • Eliminate purchasing switches • from Stahl & Bartec • Key component for global Control Stations, • Panel boards, and new Plug & Receptacle • Cost reduction = $25/ unit = $180K/yr • Current Status: • Tooling completed • Certification in process • Expected Launch: Nov 10 • Current Status: • Design completed • Tooling in process • Expected Launch: Mar 11 • 32 Amp IEC/NEC Flameproof Switch • Eliminate purchasing switches • from Stahl & Bartec • Cost reduction = $50/unit • 16 & 32 Amp Interlocked • Plug & Receptacle • Sales $3.1M 5th yr • Compete with CEAG • and Stahl • 44 Finished Good skus • Current Status: • Concept design in process • Prelim. vendor quotes in process • AR to be submitted Dec 10 • Target Launch: Oct 11

  3. Plug & ReceptaclesSingle and MultiPin Connectors • Single Pin Connectors • Rig Market • Sales: $2.5M 5th yr • Compete with Crouse / • Camlok RigPower, Leviton • SKUs: 200 skus • 4 models x 5 sizes x 10 colors • Current Status • Internal development while evaluating • partnerships • Competitive analysis complete • Concept design in process • AR by Jan 11 • Target Launch: Dec 11 Partnership Target Launch: Dec 11 • Single Pin Connectors • Telecom Industry • Sales: $1.2M 5th yr • Compete with Cooper, • Hubbell, Marinco, Leviton • SKUs: 304 skus • 2 series x 3 cable sizes x 8 colors • + various taps Partnership Target Launch: Oct 12 Multipin Connectors

  4. Enclosures & ControlsPowerPlex – a $10M initiaitve IEC Panelboards • IEC Main Breaker 3 Poles • Single housing for 3-Pole • Cutler-Hammer Main Breaker • with IEC Ratings • Current Status • IECEx & ATEX Certification • testing completed - Sept 10 • Launch: Oct 10 • Current Status • Competitive Analysis complete • Concept Design in progress • Marketing concern regarding size • and cost – reviewing alternatives • AR by Nov 10 • Target Launch: Aug 11 • IEC Branch Breakers • 12 Poles • Single housing for • up to 12 circuit breakers • IEC Branch Breakers • 6 Poles • Single housing for • up to 6 circuit breakers • Current Status • Competitive Analysis complete • Concept Design in progress • AR by Nov. 10 • Target Launch: Aug 11 • Current Status • Competitive analysis - complete • Concept design in progress • AR by Nov. 10 • Target Launch: Dec 11 • IEC Main Breaker 4 Poles • Single housing for 4 Pole • Main Breaker – ABB and • Schneider • Design also can • accommodate contactors

  5. Enclosures & ControlsPowerPlex – a $10M initiative IEC Contactors/ Starters • IEC/NEC Contactor • Up to size 2, 105 Amp • Modify F-frame beaker • housing to accommodate • small contactors • Current Status • Design complete • Testing in progress • Expected Launch: Jan 11 • Current Status • Competitive analysis - complete • Concept design in progress • AR by Nov 10 • Target Launch: Dec 11 • IEC Contactors and Starters • Single housing for Contactors up • to Size 3 and Motor Starters up • to size 2 • Accommodate ABB and • Schneider product range • Control Components for IEC Panelboard • Switches, Fuses, • Ammeters Voltmeter Control Components • Current Status • Buyouts – Identifying vendors and • sample review • Target Launch: Jan. 12

  6. Enclosures & ControlsStainless Steel and Polyester New Product - line • Enclosures • Current line is broad – but not “optimal” • Designed over 20 years ago - the designs • and sizes are not suitable for all applications • Example: we utilize same enclosure for • junction boxes and panels, but the • applications require different “depths ” • Project is to develop new range of • enclosures to better accommodate • powerplex and other components • Enclosures – recent accomplishments • Achieved global ratings – IEC, ATEX, CSA, CSAus • Transferred Stainless Steel and small Polyester Enclosures • to new vendors in Eastern Europe to reduce costs • - Larger polyester boxes still at Legrand • Reduced the number of SS Enclosure we purchase from • 104 to 13 through in-house customization program • - consolidate volume , reduce complexity • Redesigned the small non-metallic enclosures to meet • marketing requirements and reduce costs • - slightly larger, new gaskets, captive screws • Establish global vendor footprint for SS Enclosures • Europe – Kirac in Turkey, 27% cost reduction • Asia – Tongrun in China, 24% cost reduction • South America – Currently qualifying Brazilian vendor • North America - vendor - open Current Product - line • Current Status • Enclosure sizes being developed • based on new line of sealed devices and • competitive offerings • Consolidate polyester boxes from 14 to 9 • sizes that are “modular” • - Use same base / different covers to • change “depth” of box • Enclosure designs in process • Target Launch: Mar 11 - Stainless • July 11 - Polyester

  7. Hazardous Lighting • Current Status • Multiple prototypes developed • In-house testing not successful to date – • significant temperature issues • Now partnering with outside LED Integration • firm, OptoTechnology, to resolve • Target Launch: Nov 10 • Current Expected: Jan 11 • Floodlighting with LED • Sales $1.5M 5th yr • Range of wattages – 70W, • 175W, 250W, and 400W • Stainless Steel Floodlighting • Sales $0.5M 5th yr • Current product not cost • competitive and rated for • US market only • Current Status • Redesign in progress • Identifying vendors in BCC • Target Launch: Mar 11 • Current Status • Working in partnership with LeGrand • on new design with metallic housing • Target Launch: May 11 • Emergency Lighting with LED • Sales $ 2.0M • Current product is made from ATX • housing and electronic components • purchased from LeGrand • Current Status • Globalize NutSteel NE850 product offering • and certifications • Phase I – expand range of ballast voltage / • frequency to meet global reqmnts • Phase II – IECex and ATEX certification • Internal testing in progress • Target Launch: June 12 • Current Expected: Phase I Nov 10 • Phase II: Feb 11 • Global Codemaster • Sales $1.2M 5th yr • Current ATX Wellglass fixture is • not cost-competitive • Utilize NutSteel NE850