1 / 7

Feedback on phase adjustment with BPTX

Feedback on phase adjustment with BPTX. Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1, BPTX2-BC1, …) done with scope No data recording implemented, only scope screenshots . First cogging with two beams. 23 Nov 2009.

ludwig
Download Presentation

Feedback on phase adjustment with BPTX

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Feedback on phase adjustment with BPTX • Using scope and LHCb BPIM boards to readout BPTX signal • BPIM only used for triggering, phase measurements (BPTX1-BC1, BPTX2-BC1, …) done with scope • No data recording implemented, only scope screenshots

  2. First cogging with two beams 23 Nov 2009 Beam-1 bucket 1 Without cable+TOF estimated delay correction 126.678 ns Beam-2 bucket 8911 -> Measured Vertex Z = -1.3 cm

  3. Vertex Z vs DT • BPTX cable length know with accuracy ~ ± 200 ps • Measured vertex Z used to x-check/calibrate DT offset, corrected value: 126.820 ns ATLAS BPTX-1 – IP2 = 146085.5 mm BPTX-2 – IP2 = 145361.5 mm (DTOF = 2.922 ns) BPTX-1 cable delay = 800.4 ns BPTX-2 cable delay = 670.8 ns Estimated offset DT(B1-B2)= 126.678 ns CMS Final resolution: ~ 50 ps (tbc!)

  4. Vertex Z variations Large changes related to RF phase adjust, some ~ 50-100 ps variations to be understood Phase adjust To be checked RF problems

  5. More feedback • DT with multibunching: nothing special implemented in 2009 • Tolerable beam spot shift: < 1cm within same fill (run), also depending on beam longitudinal size (to be confirmed…). Larger shifts clearly an issue if during same fill/run • External clock handshake?Resynchro only during setup, change needs agreement on new procedure

  6. 2010 issues • No synchronized BCreffor 2010: in principle not an issue • Will we use the BPTX to check the alignment? Should/could the data be published? Which format?LHCb BPIM (with new FW) will measure bunch by bunch phase and intensity + DT of bunch pairs, check filling scheme (ghost bunches, abort gap), data published over DIP (agreed format)

  7. 2010 issues • If the phase is 'wrong', what should be the procedure? (experts won't be there night and day on a long term basis) Procedure to be agreed with experiments • If rephasing is done, could it be during 'stable beam'? If yes, will the feedback be given by vertex reconstruction? How fast is it? Not during ‘stable beam’ unless new procedure is established. Info on vertex available ‘online’.

More Related