NEPTUNE POWER SYSTEM DESIGN. Total NSF Expenditures. AMOUNT SPENT $231,600 (12%). TIME EXPENDED 29%. NEPTUNE POWER SYSTEM DESIGN. APL NSF Expenditures. FABRICATION. NON - FABRICATION. AMOUNT SPENT $105,470 (40%). AMOUNT SPENT $69,545 (21%). NEPTUNE POWER SYSTEM DESIGN.
E N D
NEPTUNE POWER SYSTEM DESIGN Total NSF Expenditures AMOUNT SPENT $231,600 (12%) TIME EXPENDED 29%
NEPTUNE POWER SYSTEM DESIGN APLNSF Expenditures FABRICATION NON-FABRICATION AMOUNT SPENT $105,470 (40%) AMOUNT SPENT $69,545 (21%)
NEPTUNE POWER SYSTEM DESIGN EE: EL-SHARKAWI FABRICATION NON-FABRICATION AMOUNT SPENT $12,483 (10%) AMOUNT SPENT $29,436 (20%)
NEPTUNE POWER SYSTEM DESIGN EE: LIU FABRICATION NON-FABRICATION AMOUNT SPENT $3,800 (4%) AMOUNT SPENT $10,863 (11%)
NEPTUNE POWER SYSTEM DESIGN JPL & OCEANOGRAPHY JPL OCEANOGRAPHY AMOUNT SPENT $0 (0%) AMOUNT SPENT $3 (0%)
NEPTUNE POWER SYSTEM DESIGN FINANCIAL SUMMARY