1 / 9

Longitudinal Coordination of Care WG

Longitudinal Coordination of Care WG. LCC Leads Meeting 5-10-2012. Agenda. LCC White Paper LCC Timelines Confirm Meeting Times for SWGs Use Case Discussion. White Paper. Use of LCC SWG Time Scope of White Paper Coordinating S&I, Roundtable and Collaborative Communities

luke
Download Presentation

Longitudinal Coordination of Care WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Longitudinal Coordination of Care WG LCC Leads Meeting 5-10-2012

  2. Agenda LCC White Paper LCC Timelines Confirm Meeting Times for SWGs Use Case Discussion

  3. White Paper • Use of LCC SWG Time • Scope of White Paper • Coordinating S&I, Roundtable and Collaborative Communities • White Paper Timeline

  4. LCC LTPAC Sub Work Group Timeline Review CCDA Template Modifications for HL7 Spring Ballot (5/4) Ballot Reconciliation: CCDA Templates Ballot Reconciliation HL7 Ballots Prepare for HL7 Ballot: PAS CCD (scope statement due 5/27) Use Case Review (4/23-6/1) Use Case Draft (3/28-4/25) Use Case Consensus (6/1-6/15) LTPAC Pilots (Includes Recruiting) S&I Process IG Development and Additional Harmonization ToC/LCC Use Case Gap Analysis Analyze & Evaluate Standards Harmonize & Finalize Standards White Paper HL7 Spring Ballot Closed S&I F2F Meeting HL7 Spring Ballot Open HL7 Fall Ballot Open HL7 Fall Ballot Closed HL7 Winter Ballot Open Milestones LTPAC Summit

  5. LCC LCP Sub Work Group Timeline Review CCDA Template Modifications for HL7 Spring Ballot (5/4) Ballot Reconciliation: CCDA Templates Ballot Reconciliation HL7 Ballots Prepare for HL7 Ballot: PAS CCD (scope statement due 5/27) S&I Process White Paper: Develop Vision for Longitudinal Care Revise White Paper White Paper HL7 Spring Ballot Closed S&I F2F Meeting HL7 Spring Ballot Open HL7 Fall Ballot Open HL7 Fall Ballot Closed HL7 Winter Ballot Open Milestones LTPAC Summit

  6. LCC Patient Assessment Summary Timeline Review of Geisinger Gobbler CCD Review C-CDA Template Modifications for HL7 Spring Ballot (5/4) Ballot Reconciliation: C-CDA Templates Workstream 1: HL7 Ballots Fall HL7 Ballot: PAS CCD & PA/Q DSTU Review(scope statement due 5/27) Ballot Reconciliation Develop Implementation Guidance Update Rosetta Stone Analyze & Evaluate Standards Harmonize & Finalize Standards Finalize crosswalks of MDS, OASIS, CARE and C-CDA Workstream 2: Design Validating Subset of OASIS Data for PAS HL7 Spring Ballot Open HL7 Spring Ballot Closed HL7 Fall Ballot Open S&I F2F Meeting HL7 Fall Ballot Closed Milestones Geisinger: Gobbler Phase 1 Rollout Geisinger: Gobbler Phase 2 Rollout

  7. LCC Schedule • LTPAC: • WG meeting Monday 11am – 12 noon • Agenda Meeting Friday 10:30am • LCP: • WG meeting Tuesday 10am – 11am • PAS: • WG Meeting Wednesday 3pm – 4:30pm • Agenda ??? • LCC All Hands – First Thursday of the Month 9am – 10am • LCC WG Leads Meeting – Second Thursday of the Month 9am – 10am

  8. Apr 29, '12 Today May 27, '12 Jun 10, '12 FinishFri 6/15/12 WG Review Draft Use CaseMon 4/23/12 - Fri 6/1/12 StartWed 3/28/12 Review Sections 1-9, 13Mon 4/23/12 - Tue 5/1/12 Use Case ConsensusFri 6/1/12 - Fri 6/15/12 Review Sections 10-12 (Scenarios)Wed 5/2/12 - Tue 5/15/12 Review Section 14 (Data Sets)Wed 5/16/12 - Tue 5/29/12 (ST) Updates based on commentsMon 6/4/12 - Fri 6/15/12 Post Use Case for ConsensusFri 6/1/12 Consensus ReachedFri 6/15/12 Use Case Timeline • (ST) Finalize UCWed 5/30/12 - Fri 6/1/12

  9. Other Discussion • ?

More Related