1 / 11

Agenda

Port Facility Disaster Preparedness March 29, 2011 TAG Port Security CIDI – OEA presented by John Bressi SSA Marine. Agenda. SSA Marine Experience Communication Response Plan Personnel Security Damage Assessment and Control Recovery Evolution. SSA MARINE Recent Facility Disaster Experience.

lula
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Port Facility DisasterPreparednessMarch 29, 2011TAG Port SecurityCIDI – OEApresented byJohn BressiSSA Marine

  2. Agenda • SSA Marine Experience • Communication • Response Plan • Personnel Security • Damage Assessment and Control • Recovery Evolution

  3. SSA MARINERecent Facility Disaster Experience • Natural Disasters, Fire, Floods, Explosions, Hazmat • 1994 – 6.7 Earthquake – Los Angeles, USA • 1995 - 8.0 Earthquake/Tsunami - Manzanillo, Mexico • 2005 - Cat 5 Hurricane Katrina- US Gulf Coast • 2005 - Cat 5 Hurricane Wilma – Cozumel, Mexico • 2010 - 8.8 Earthquake/Tsunami - San Vicente/ San Antonio, Chile

  4. Communications • Civil Defense, Port Authority, Headquarters, Neighboring Terminals, and Embassy • Monitor NBS (National Broadcasting System)/VHF/UHF/AM/FM/SW • Establish Communications via Satellite Telephone and Texting • Establish Communication with NBS and Local Radio Stations • Communicate Seaport Ready Status • Door to Door Census • Notify Customers and Insurance

  5. 2 3 Response Plan • Distribution, Training, Drills, Maintenance • Activate Emergency Response Team • Personnel Plan • Shelters and Evacuation Routes • Secure Shore Side Cranes and Dispatch All Vessels • Containment • Provide Electricity, Water, Sanitation • Prepare Barter System • Initiate Documentation Process TSUNAMI ALERT NORTH Evacuation Route Marshalling Areas 3 and 2

  6. Personnel Security and Accountability • Administration of First Aid and Rescue • On Site Accountability • Evacuation of Non-Essential Personnel • Distribution of Rations • Establishment of Accountability Census • Re-entry Restriction • Social Services

  7. “La Gloria Hill Water Tank” Damage Assessment and Control • Evaluate Risk and Prioritize • Under Dock Inspection • Infrastructure • Superstructure Inspection • Equipment Inspection • Fuel and Water Inventory • Vial Access • Public Relations Communication Plan

  8. Recovery EvolutionImmediate • Re-Establish Head Quarters • Damage Triage • Reinforce and Provide Quay Access • Clear Seabed of Debris • Inventory and Reorganize Yard and Warehouse • Separate and Clear Damaged Cargo • Assist in Repair of Access Roads • Information Systems • Secure OK to Resume Operations

  9. Recovery Evolution Short Term • Initiate Vessel Operations • Detailed Engineering Survey • Initiate Shore Crane Operations • Contract STS/Heavy Repair Services • Salvage Damaged Cargo and Materials • Opportunity Cargo • Insurance Process • Concession Implications • Mitigation Repairs • Employee Welfare Donations

  10. Recovery EvolutionMedium to Long Term • Monitor Damage Continuously • Concession Negotiations-Resolution • Insurance Negotiations-Constant Pressure • Repair/Improvement Engineering • Feasibility Financial Model • Coordinate Repair Process

  11. Thank You !Gracias !

More Related