An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The overlapping case in an integrated staffing and rostering formulation Komarudin, M.-A. Guerry, G. VandenBerghe, and T. De Feyter

  2. Contents • Introduction • Personnel structure • Nurse rostering problem • Literature review • Roster Quality Staffing (RQS) Problem • Subgroup formulation • Overlapping rostering constraint • Illustration • Conclusion and future research

  3. Introduction - Personnel structure • represents the number and the composition of distinct personnel subgroups • used for (long term) manpower planning

  4. Introduction - Nurse Rostering • concerns arranging the available nursing personnel to work requirements. • Short to medium planning period M: Morning (6-14) D: Day (14-22) N: Night (22-6) S1: Skill-1 S2: Skill-2

  5. Nurse Rostering Problem Day-shift after night shift • Many constraints • Quality = the violation of soft constraints • The lower the better M = Morning (6-14), D = Day (14-22), N = Night (22-6)

  6. Nurse Rostering Problem -More on Soft Constraints • NP-hard Problem Used metaheuristics (VNS & ALNS ) Refer to Bilgin et al. (2010) for more detail

  7. Motivation Usually fixed

  8. Motivation Usually fixed How we can determine PS  good quality roster? Feedback Undesired condition • Understaffing • Overstaffing • Conflicting constraints

  9. Literature review

  10. Roster Quality Staffing (RQS) Problem statement How to investigate the suitability of a personnel structure while considering the roster quality? Roster quality Personnel structure Roster

  11. Three-step approach Roster Quality Staffing (RQS) Problem statement • Static check • Roster quality component examination • Simple neighbourhood examination How to investigate the suitability of a personnel structure while considering the roster quality? Roster quality Personnel structure Roster

  12. New formulation Subgroup formulation Overlapping rostering constraint

  13. Defining subgroups on RQS 1 • Characteristics to differentiate subgroups : the set of characteristics for subgroup is the -th characteristic of subgroup . • Example:

  14. Subgroup formulations on RQS • Exactly-same characteristics based , • Main-characteristic based , beneficial if the main-characteristic has a high penalty weight.

  15. Subgroup formulation on RQS (application) • Multiple wards • Float unit personnel • Cross-trained personnel • Example:

  16. 2 Overlapping personnel constraints • Subgroup-specific vs. overlapping • Overlapping: associated with two or moresubgroups. • Example: • coverage requirements for skill C • tutorship, etc.

  17. Models for overlapping rostering constraints • possessed by at least two subgroups, e.g. coverage reqs. for float unit , , and . • partiallypossessed by at least two subgroups, e.g. tutorship , , , and . 1 – Substitution (OR) 2 – Complementary (AND) Characteristics of subgroup i Characteristics of overlapping rostering constraint l

  18. Application on three-step approach Three proposed examinations: • Static check • Roster quality component examination • Overlapping rostering constraints • Simple neighbourhood examination Subgroup formulation  three examinations

  19. Illustration • Emergency ward taken from Bilgin et al. (2012) • 4 weeks Exactly-same subgroup based

  20. Emergency ward(1) static check & (2) roster quality 1 Reasonable, provide some extra time for vacation/illness

  21. Emergency ward(1) static check & (2) roster quality 1 Reasonable, provide some extra time for vacation/illness 2 The lower the better Soft constraint violations Skill 4 understaffed Substitution overlapping constraint G2, G3 & G4

  22. Emergency ward(3) Simple neighbourhood examination 3 The lower the better

  23. Emergency ward(3) Simple neighbourhood examination 3 Wilcoxon test produces very low p-values, close to zero. Difference significant Add G2, G3 & G4 Skill 4 understaffed

  24. Conclusion Conclusions: • Subgroup formulation provides more general formulation: • multi-ward, float unit, cross-trained, etc. • Overlapping rostering constraint: • clarifies the source of a low roster quality • RQS problem can be decomposed into smaller problems Future directions: • develop an optimization approach to find the most preferable personnel structure • Integrate with manpower planning

  25. References • Abernathy, W. J., Baloff, N., Hershey, C. J. & Wandel, S., 1973. A Three-Stage Manpower Planning and Scheduling Model-A Service Sector Example. Operations Research, 21(3), pp. 693-711. • Bard, J. F. & Purnomo, H. W., 2005. A column generation-based approach to solve the preference scheduling problem for nurses with downgrading. Socio-Economic Planning Sciences, 39(3), pp. 193-213. • Beliën, J., Cardoen, B. & Demeulemeester, E., 2011.. Improving workforce scheduling of aircraft line maintenance at Sabena Technics. Interfaces. In Press. • Bilgin, B., De Causmaecker, P., Rossie, B. & VandenBerghe, G., 2010. Local search neighbourhoods for dealing with a novel nurse rostering model. Annals of Operations Research, pp. 1-25. • Broos Maenhout and Mario Vanhoucke. An integrated nurse stang and scheduling analysis for longer-term nursing sta allocation problems. Omega, 41(2):485{499, 2013. 429 • Corominas, A., Lusa, A. & Pastor, R., 2007. Planning production and working time within an annualised hours scheme framework. Annals of Operations Research, 155(1), pp. 5-23.

  26. References • Li, Y., Chen, J. & Cai, X., 2007. An integrated staff-sizing approach considering feasibility of scheduling decision. Annals of Operations Research, 155(1), pp. 361-390. • Mundschenk, M. & Drexl, A., 2007. Workforce planning in the printing industry. International Journal of Production Research, 45(20), pp. 4849-4872. • Ozcan, Y. A., 2009. Quantitative Methods in Health Care Management: Techniques and Applications. 2nd ed. San Fransisco: Jossey-Bass. • StefaanHaspeslagh. Negotiation at the short and mid term level supported by analysis of nurse rostering problems. PhD thesis, Computer Science, Kulak, 2012. • Venkataraman, R. & Brusco, M. J., 1996. An integrated analysis of nurse staffing and scheduling policies. 24(1), pp. 57-71.