30 likes | 696 Views
Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines. Purpose of this project To restore and return the state lands for future development and to fill up the voids of abandoned pipelines to prevent their collapse Project Status
E N D
Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines • Purpose of this project To restore and return the state lands for future development and to fill up the voids of abandoned pipelines to prevent their collapse • Project Status Tender for the Works is expected to be called in Nov 2009 • Scope of the Works • Demolition ofKim Chuan Water Reclamation Plant, Serangoon Sludge Treatment Works and Wash Water Pumping Station • Grouting of pipelines: 1) Outfalls - 4km of 1800mm dia,10km of 1580mm dia 2) Sludge Mains - 10km of 457mm dia 3) Pumping Mains - 4km of 457mm dia
SERANGOON STW WASH WATER PS TECK HOCK PS EFFLUENT OUTFALL PIPES SLUDGE MAINS PUMPING MAIN DEMOLITION SITES KIM CHUAN WRP Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines