1 / 9

AfricaRISING Ethiopia

AfricaRISING Ethiopia. Current Status. Six Quick Wins. Quick Feeds ILRI / ICARDA Quick Water IWMI / ILRI Integration of pulses ICARDA Tree - livestock interactions ICRAF / ILRI Research Design ILRI / CIMMYT ( All engaged with EIAR / regional ARCs at some level).

luna
Download Presentation

AfricaRISING Ethiopia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AfricaRISING Ethiopia Current Status

  2. Six Quick Wins • Quick Feeds ILRI / ICARDA • Quick Water IWMI / ILRI • Integration of pulses ICARDA • Tree - livestock interactions ICRAF / ILRI • Research Design ILRI / CIMMYT (All engaged with EIAR / regional ARCs at some level)

  3. Research Design ILRI /CIMMYT • Inputs to earlier drafts of research framework • Opportunities to support the selection of techniques at the project level • Other opportunities to use this project to strengthen / expand the programme research framework. • Project workshop will bring together some key players

  4. Trajectories (IWMI / ILRI)

  5. Characterisation / Typologies • Livelihoods asset based ILRI / ICARDA • Indigenous knowledge ICRAF / ILRI • Participatory ILRI / CIMMYT

  6. Site Selection Criteria • Chris Legg analysis • Continuity / meeting expectations raised by Quick Wins • Other potential synergies (CRP 1.2 / CRP 3.7 etc.) • More detailed assessments of potential for SI / crop-livestock synergies • 90% firm after planning workshop • Should it be phased / needs focus on RF / hypotheses

  7. Meetings (Ethio-specific) • Quick wins workshops • Quick Feeds 3 – 4 September • Research Design 13 – 14 September • Quick Water 14 September • Review and planning workshop 17 – 18 September

  8. Positives • Quick wins off to a strong start • On the ground NARS collaborations are effective • Inter-centre collaboration very encouraging • Negatives • Higher level partnership building needs more work

  9. Outstanding Issues • Staffing • Existing CG personnel / recruitment • M & E “responsibilities” (share?) • How to mobilise • Coordinated research or “Challenge” / Opportunistic • Both? What would the split be - 80 : 20? • Full / inclusive engagement with partners (NARS + CG)

More Related