420 likes | 559 Views
Stormwater Target Watersheds: Methods and Maps. In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and Pre-Design Funded by the National Estuary Program Watershed Protection & Restoration Grant Program. February 2013. Methods.
E N D
Stormwater Target Watersheds:Methods and Maps In Support of 2013 Solicitation for Proposals to Conduct Stormwater Retrofit Planning and Pre-Design Funded by the National Estuary Program Watershed Protection & Restoration Grant Program February 2013
Methods • Select Assessment Units (AUs) with High/Moderate High values for overall Water Flow • Select those that intersect/border urban growth areas (UGAs) • Add AUs with sound-wide H/MH value that intersect/border UGA • Remove AUs with >90% urban area
1. Select AUs with High (H) and Moderate High (MH) Scores for Water Flow
3 & 4. Add AUs with Sound-wide importance; Select Any Remaining AUs with UGA That Is Either Immediately Upstream or Intersects H & MH AUs This UGA will directly affect a downstream AU of high or moderate high importance for Puget Sound This AU of high or moderate high importance for Puget Sound intersects a UGA Remove any areas of high imperviousness (i.e. >90% developed)
Overlay Stormwater Target Areas with Watershed Management Units (black boundary) By using the characterization results for water flow we will be able to evaluate the relative degree of intactness (less degradation) and importance for water flow processes for these Watershed Management Units (WMU). A watershed that is more intact and has a higher importance should provide a greater “lift” in biological functions as stormwater restoration measures are applied.
Summary Overlay of Stormwater Target Areas (pink) with Watershed Management Units (WMU – black outlines) for Puget Sound Watersheds
Steps for Applying Watershed Integrity Index to Watershed Management Units Score = 2+ Divide the watershed roughly in half, thus creating an upper and lower watershed Pick the dominant color or color combinations in the two halves, upper and lower watersheds, and match as closely as possible to one of the index diagrams The color combinations are limited to dark green/light green; dark yellow/light yellow; orange/red. Ignore colors, for the time being, that do not match these set combinations. Add a “+” or “-” to the score based on the presence of additional colors not matching the individual matrix diagram. For example, if the watershed is predominately “yellow” you would pick index 5, but add a “-” if more “red” was present as a secondary color. If “green” was present you would add a “+”. In the example above the dominant color combination matching the diagram for the upper watershed would be “orange/red” and for the lower it would just be “yellow”. This would match the #2 index. The presence of the “green” non-dominant colors in the upper and lower watershed would indicate a shift in integrity towards the left of the index; thus a “+” would be added to the score.
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area WMUs on the mainstem of the Nooksack were evaluated relative to their upper watershed in the Cascades which is judged to be relatively “intact” (i..e green colors, not shown on map) and were scored an “8”
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area WMUs on the mainstem of the Skagit were evaluated relative to their upper watershed in the Cascades which is judged to be relatively “intact” (i..e green colors, not shown on map) and were scored an “8”
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a TargetyStormwater Area • WMUs on major streams (Sammamish, Snohomish, Skykomish, Snoqualamie & Cedar Rivers ) were evaluated based on the cumulative upstream condition of those watersheds (e.g some of which extend into the Cascades).
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area WMUs major streams (Cedar, Green Rivers ) were evaluated based on the cumulative upstream condition of those watersheds (e.g some of which extend into the Cascades).
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area • WMUs on major streams (Deschutes, Puyallup, White) were evaluated based on the cumulative upstream condition of those watersheds (e.g which extend into the Cascades).
Watershed Management Units & Watershed Integrity Index For Each WMU Containing a Target Stormwater Area
Watershed Integrity Index with Watershed Management Unit (WMU) Names
Stormwater Retrofit Target WatershedsWith Watershed Integrity Index (1-9)for the Watershed Management Unit (Black boundary)