1 / 6

Pass Your C9010-262 Exam with Authentic C9010-262 Dumps [PDF]

Download Complete IBM C9010-262 Exam Questions and Answers Here: https://dumpsofficial.com/exam/IBM/c9010-262-dumps/<br>Get 20% Discount by using SAVE20 Coupen Code.<br><br>DumpsOfficial.com Offers you Actual and Updated C9010-262 Exam Questions and Answers verified by IBM Experts. Download your C9010-262 Exam Questions Copy from DumpsOfficial.com

luzbranton
Download Presentation

Pass Your C9010-262 Exam with Authentic C9010-262 Dumps [PDF]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBM IBM Certified Technical Sales Specialist - Power Systems with POWER8 Enterprise V2 C9010-262 Exam Question & Answer PDF (FREE --- DEMO VERSION) Thank You For Reviewing C9010-262 Exam PDF Demo Get Full Version of C9010-262 Exam Question Answer PDF Here: https://dumpsofficial.com/exam/IBM/c9010-262-dumps/

  2. Version: 9.0 Question 1 A customer has ordered an E870. The system has been built, but cannot be shipped What would prevent the system from being shipped? A. The mandatory pre-install TDA has not been completed B. The IBM System Support representatve has not completed the pre-install site visit. C. A pre-sale TDA discovered correctable issues that have not been corrected. D. The opportunity owner has not released it. Aoswern B Question 2 What is the most cost-efectve Capacity on Demand (CoD) ofering that will allow a new analyze the efects of actvatng two cores on an E870 and 32GB of memory for one month? A. Trial B. Elastc C. Enable Mobile Actvaton D. Utlity Aoswern A Question 3 A client is evaluatng business contnuity and high availability solutons for their mission critcal trading applicaton. Which of the following oferings provides a clustered soluton that will minimize unplanned downtme? A. Inactve Partton Mobility B. PowerHA SystemMirror C. Remote Restart D. Live Partton Mobility Aoswern B Question 4 A customer wants to migrate two IBM i 7.2 IPARs to their existng E880. Each LPAR needs VIOS will not be implemented. Which soluton will satsfy the customer's needs?

  3. A. Four PCIe3 12GB Cache RAID SAS adapters and two 5887s (mode 1). each with 12 SSDs B. Two PCIe3 1 2GB Cache RAID SAS adapters and two 5887s (mode 1), each with 12 SSDs C. Four PCle3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs D. Two PCIe3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs Aoswern D Question 5 A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR. Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV. In additon to assigning the adapter to the VIOS, what else needs to be done? A. Reassign the tape to client LPARs as needed. B. Complete the vSCSl connectvity and map the tape to client partton C. Assign the tape drive to the parttons. D. Complete the NP1V connectvity and map the tape to client partton. Aoswern D Question 6 A customer would like to have a mirrored pair of SAS disks server with dual VIOS. What is needed to accomplish this? A. Four 300GB drives. EXP24S in mode 1 Two SAS adapters B. Four 300GB drives in PCIe Gen3 drawer Two SAS adapters C. Four 300GB drives. EXP24S in mode 2 Integrated SAS adapters D. Four 300GB drives. EXP24S in mode 2 Two SAS adapters Aoswern A Question 7 In the PCIe Gen3 I/O Expansion Drawer how many PCIe3 slots are available per fan-out module' A. 8 B. 6 C. 12 D. 4 Aoswern B Question 8

  4. A customer is considering the purchase of a new EB70. They plan to atach it to an existng V70W using the low profle 8Gb Fibre Channel adapter. Which IBM resource should be used to fnd the supported soluton? A. Confgurator (e-confg) B. System Planning Tool C. System Storage Interoperaton Center (SSIC) D. Knowledge Center Aoswern B Question 9 What availability advantage does POWERS ofer compared to x86 technology? A. Storage Protecton Keys B. Memory Mirroring C. Memory Caching D. Chipkill Memory Aoswern A Question 10 A customer is comparing POWER8 and x86 solutons where availability of the Processor is a consideraton. What is a beneft of the POWER8 architecture? A. First Failure Data Capture B. Redundant registers C. Chip Kill D. Actve Processor Mirroring Aoswern A Question 11 Which of the following workloads can be managed using IBM Cloud PowerVC Manager? A. Windows and Linux B. Linux and Solaris C. z/OS and AIX D. Linux and AIX Aoswern D

  5. For Downloading C9010-262 Exam PDF Demo Get Full Version of C9010-262 Exam Question Answer PDF Here: https://dumpsofficial.com/exam/IBM/c9010-262-dumps/

More Related