An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dikella Offshore Windfarm50 MW Presentation August 2010

  2. Area of installation:Sea district 6km southwest of Dikella, 20kmsouthwest • of Alexandroupolis, Evros Prefecture, Thrace. • Distance from coast: 3-5 km • Capacity: 50MW (with potential for 70MW expansion) • Number of W/T: 10 • W/T size: 5MW • WT Type: AREVA Multibrid M5000 • Installation depth: 30-40m • Connection Point: Ultra Height Voltage Substation of Nea Santa • Connection Grid: • - Submarine Middle Voltage (20 or 30KV) Cables to the coastal Substation (5Km) • - Middle Voltage (20 or 30KV)/Height Voltage (150KV) Substation at a suitable place near the coast. • - Underground Height Voltage (150KV) Cable to the Ultra Height Voltage Substation of Nea Santa (35Km)

  3. Project maturity: • - Application to RAE (Regulatory Authority for Energy) Reg. Num. I-114032/01.06.2010 • - Letter from DESMIE (Hellenic TSO) suggesting the Ultra Height Voltage of Nea Santa as connection Point. • - License from civil-works directory of East Macedonia and Thrace Region for a floating metering-mast installation at sea. • - Private Agreement and Quotation from CRES for installation of a the mast in the site of interest. • - Quotation from local construction facility for construction, transportation, installation and maintenance of a floating met-mast carrying platform • - Lobbying with DESMIE, RAE end local Authorities for the go-ahead movement. • - Certified, one year long, Wind Data from two adjacent land-locations adequate for the Application in RAE and suitable for a preliminary Energy Study. - Inquiry from two reliable sources for conducting preliminary Energy Study.

  4. Rough technical-financial estimations • Mean Wind velocity: 7,0-8,0m/sec • Annual production (c.f=28,5%, Pinst:120MW): 300.000MWh/yr • Price :150 [€/KWh] • Annual income (prices 2010): €45mio/yr • Construction cost: €360mio • Financing Structure: 40% Loan, 25% Equity, 35% Subsidy

  5. Construction cost analysis

  6. Preliminary Financial Analysis

More Related