PS3: Protection & Control of Series Compensated Networks

PS3: Protection & Control of Series Compensated Networks. Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to series compensated lines?. Electricity Supply Network. 1998 330KV Double Circuit 225km.

lynde
Download Presentation

PS3: Protection & Control of Series Compensated Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PS3: Protection & Control of Series Compensated Networks Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to series compensated lines?

  2. Electricity Supply Network

  3. 1998 • 330KV • Double Circuit • 225km SP AusNet Network

  4. No 1 line No 2 line Project Objectives DDTS Compensation: 50 % Transfer Capability restored to 1500 MW, 36% improvement Total project cost $A13.5 M Completion period 14 months SMTS

  5. SMTS DDTS Discharge Reactor MOV Spark Gap Bypass Circuit Breaker Capacitor Arrangement

  6. Distance Relay Problems • Distorted Distance Measurement • Incorrect Directionality (Voltage & Current inversions) • Transient over- and under-reach ( Sub- sychronous Transient Oscillations) • Nonlinear & solid by-passing of capacitors initiate transient changes of : • Voltage magnitude and polarity • Impedance measured

  7. B C A D Line # 1 Line # 2 Line # 3 E E Incorrect Reach

  8. Fault Simulations

  9. First cycle Second cycle Third cycle Z Internal Fault Forward (operating) reach jX dynamic static R Reverse (blocking) SMTS, No 1 (Faulty) Line Relay, Fault on No 1 line, MOV, no Gap

  10. First cycle Second cycle Third cycle External Fault Forward (operating) reach jX Z dynamic static R Reverse (blocking) SMTS, No 2 (Healthy) Line Relay, Fault on No 1 line, MOV, no gap

  11. Relay Selection • 2 x Distance + existing Power Line Carrier • reliable • Under/over reach • transmission time 30ms • 1 x Current Diff + new μWave Radio • many faults faster than distance schemes • signal fading

  12. 60 50 40 X SEL/S X SEL/D 30 X LFCB/S X LFCB/D 20 Y ALPS/S Y ALPS/D 10 0 SMTS Loc 1 Loc 2 Loc 3 Loc 5 DDTS 1 2 3 5 Operating Times

  13. Summary • Transient fault studies essential for SC Lines • Difficulty to gather data. • Automatic Test Equipment extremely useful design tool • Derived from paper:“Fault simulation studies for protection of series compensated lines” • Adam Klebanowski, GPU PowerNet, Victoria, Australia • Asia Pacific Regional ProTest (DOBLE) User Group Meeting, Melbourne, Australia, 1999 • adam.klebanowski@sp-ausnet.com.au