1 / 6

LHCb GRID Meeting

11/12 Sept 2000. LHCb GRID Meeting. AGENDA. 9:30 LHCb MC Production Points SICB Processing Req. Data Storage Data Transfer Quality Checking Bookeeping ?? Discussion Points of Action 11:00 Tea 12:00 Departure for. Action Items Responsibilities.

lynna
Download Presentation

LHCb GRID Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 11/12 Sept 2000 LHCb GRID Meeting

  2. AGENDA • 9:30 LHCb MC Production • Points • SICB • Processing Req. • Data Storage • Data Transfer • Quality Checking • Bookeeping • ?? • Discussion • Points of Action • 11:00 Tea • 12:00 Departure for LHCb-GRID T. Bowcock

  3. Action Items Responsibilities • SICb – Eric, Martin (L), David S. (RAL) • Production • Bbar inclusive 500k events in DST2 fomat without trigger requirements (RAL) • 2M events in mini DST2 format (600kB/evt) after L0/L1 cuts (Liverpool) • Need to generate about 20M events at 210 secs • Reconstruct 2M at 130 secs /event • DST2 : min bias 2M at 100 secs/evt • Min bias reconstruction 2M at 50 secs /evt • Pileup 2M at 50 secs/evt • Total : 20M at 250 secs / event (6 mths on MAP) • Target 500 events/file : merge files if necessary • Total data sample (2M evts) is 1.2 TB LHCb-GRID T. Bowcock

  4. Action Items • Data storage/Transfer • Data rate generated 60kB/sec • Network bandwidth Liverpool – CERN 500 kB/s overnight (50% duty cycle) • Bandwidth Liverpool – RAL to be measured • Data at MAP (disk), copy to RAL , copy RAL to CERN where central bookkeeping is updated • Data sample corresponds to 50 x 20 GB tapes (5kSFr) • Try direct transfer from Liverpool to CERN • Eric (CERN), Martin (liverpool), Dave S (RAL) LHCb-GRID T. Bowcock

  5. Data Quality Checking • SICbCHK now exists (summer student) • Histos available viewable from web • AJ data quality manager responsible • No formal responsibility for data quality checking at Liverpool • RNDM numbers : seeds? Chris to email Eric with DELPHI scheme. LHCb-GRID T. Bowcock

  6. Bookkeeping • For production – use same mechanism for generating scripts for submitting batch jobs. • Event type, size of dataset etc • Send back log files (at least in short term), incl. new log file with bookkeeping information • Update database at CERN on receipt of the data • Database has entry with name of dataset at place where it was generated • Joint development needed (Eric and new postdoc at Liverpool) LHCb-GRID T. Bowcock

More Related