1 / 8

BJ material for Roberto at ACE, 20 sep 08

BJ material for Roberto at ACE, 20 sep 08. Worked-out set : DB long Transfer Line, see below Combiner rings : My set of slides ‘CR1_status.ppt’ at last beam_dyn meeting Aim was to fix the momentum band from 2% down to 1% This was felt premature to discussit ACE

lynton
Download Presentation

BJ material for Roberto at ACE, 20 sep 08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BJ material for Roberto at ACE, 20 sep 08 • Worked-out set : DB long Transfer Line, see below • Combiner rings : • My set of slides ‘CR1_status.ppt’ at last beam_dyn meeting • Aim was to fix the momentum band from 2% down to 1% • This was felt premature to discussit ACE • No ‘positive results’ yet , see the slides • Roberto may decide to just say that I am at work on this from now on. • Turn-Around : • Missing in the ACE agenda • I proposed that Frank could provide Roberto with a few slides (from his forthcomimg EuroTeV talk)

  2. DB long transfer line : simple optics but 21 km long • Optics • Parasitic dispersion + |dp|=2% => emittance dilution • Logistics • Beam line suspended to the ceiling • Light & transversely thin magnets preferred • Cost & power • Weak magnets preferred • Collective effects • Trains : 100 A , 73 m long • Strong transverse multi-bunch resistive wake-fields • Ions => detuning & instabilities Deserves global optimisation

  3. Optics & logistics : Optimisation • Use thin FODO formalism • All functions can be expressed as a.u. a.u. See: CLIC Note 760 BJ+HB Paras. dispersion Paras. kicks Phase advance: 45o looks good (also better for correction schemes) Number of cells µ µ a.u. Power Max beta and cell length : As large as possible µ a : vacuum chamber aperture

  4. Parasitic dispersion andChromatic phase error • With a rms relative offset beam/quadrupole dx = 0.1 mm • With p = 2%, n=10-4 mrad, max=195 m => Dpar p / beta = 1.8 • Still not adequate, need either • BPM resolution dx < 0.03 mm • Or Beam-based alignment • Chromaticity : with Lcell=100m, Cline = -28 •  = -200o at p = 2% • Normalised injection will add quadratically to emmitance • Either • Work-out a precise injection scheme (reliable to < 0.1 beta) • Or implement a chromatic correction (worked-out but complicates the line)

  5. Transverse multi-bunch resistive wake-fields • A bunch displaced by (s) at s leaves a dipole field which decay slowly with 1/t-1/2 or 1/z-1/2 • With double-summing over n-bunches and segments l where  ~const : • Large effect & no feed-back possible on a straight beam line • Small chambers and stainless steel ruled-out • Use copper, large radius • Drive Beam : a = 100 mm • Main Beam : a = 60 mm See CLIC Note 761, BJ et al.

  6. Results for Wperp • With Cu chamber, radius a=100 mm • Norm. emittance growth ~ 5% with misalignments • Injection errors amplified by 10%

  7. Ion effects See CLIC Note 761, BJ et al. TOR+DS, unpublished Clic note,1999. • Electrons will ionize the residual gas • Positive ions will be trapped in the train (but not between trains) • They induce detuning • And beam-ion instabilities A~0.1 : frequency factor Qi=1 : ion charge OK with the quoted pressure => Need getter+bake-out Factor 3 for uncertainty of the model

More Related