Chapters 16 and 17. System Analysis, Designs, and Development. Systems Development Horror Stories. Blue Cross, $120 million Bank America, $60 million and $4 billion SAP overruns “Bob One”, $50 thousand “Bob Two”, $30 thousand. Steps in Systems Development (Bob Two).

mabyn
Download Presentation

Chapters 16 and 17

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapters 16 and 17 System Analysis, Designs, and Development

  2. Systems Development Horror Stories • Blue Cross, $120 million • Bank America, $60 million and $4 billion • SAP overruns • “Bob One”, $50 thousand • “Bob Two”, $30 thousand

  3. Steps in Systems Development(Bob Two) • Initial Investigation • Systems Survey • Feasibility Study • Information Needs and System Requirements • Systems Analysis Report

  4. Data Gathering • Interviews - vitally important • Questionnaires - cheap, anonymous • Observation - not really what you were told? • Systems documentation - ‘nuff said?

  5. Feasibility • Technical • Operational • Legal • Scheduling • Economic

  6. Reengineering • Outcomes, not tasks • Output users perform processes • Information producers become processors • Centralize and decentralize (simultaneous) • Integrate across teams • Flatten organization chart (empower) • Capture data once (sound familiar?)

  7. Resistance to AIS ChangesMore “Bob” stories • I’ve been a CPA for 25 years…… • I just passed the CPA exam and …… • My professor told me…… • My boss still wants hard copies…… • Upstairs wants IT, but won’t pay for IT… • AKA, life on the cheap

  8. Solving HR/AIS Problems • Get people talking • Ask, do not tell • We discussed, not I want • How can we get the boss to accept our idea? • What do you think we should do? • Let employees have an opportunity for feedback • Document and protect yourself

  9. RFP • Request for Proposal • Force our team to quantify our needs • Force suppliers to address our needs • not just supply their standard product • Difficulty: degree of customization

  10. SDLC Systems Development Life Cycle • Analysis • Conceptual Design • Physical Design • Implementation and Conversion • Operations and Maintenance • Begin again...

  11. Project Management Tools • Traditional Tools (now electronic) • Pert • Gantt • Development Tools • to develop and track • Computer Aided Software Engineering (CASE)

  12. Software Development Options • Canned • not modified • very modified • Custom built in-house • Turnkey

  13. Project Evaluation • Benchmarking • IPO cycle time / accuracy • Point Scoring (Prob 18.4) • to meet our design • so, how well did we design? • Requirements costing • additional cost for our wish list

  14. Custom Vs. Canned • Select custom if • significant competitive advantages exist • the product cannot be obtained as “canned”

  15. Prototypes • Prototype • fully functioning system • used to identify problem areas • Proof of Concept • one step below a prototype • low cost experiment • DHS example

  16. DHS Proof of Concept Brad Howarth & Javier Seymore

  17. Employer-DesiredTraits for Employees (Pro2pro) • 26% Work ethics • 20% Positive attitude • 19% Social skills/Team player • 11% Ambition • 9% Flexibility • 8% Attention to detail • 4% Communication/Writing skills • 3% Computer savvy • 1% Other