IE 327 Introduction to Work Design Dr. Andris Freivalds Class #18 IE 327
Implement Proposed Method(Ch. 8, pp. 333-345) Decision Making Tables – Hazard Action Table IE 327
Cut-Off Operation(Disposable scalpel blades) • Surgical steel blades pre-cut on strip • Places rubber nib on last blade • Presses pedal to separate blade • Picks up and inserts into foam pad on tray which goes • For further assembly into handle IE 327
Alternative Methods for Cut-Off Operation • Ankle fatigue – replace manual foot pedal with electric foot switch • Neck fatigue – adjust stereoscope • Neck fatigue – video projection system • Pinch grip – gravity drop chute • Pinch grip – replace tweezers with vacuum operated stylus IE 327
Decision Table Analysis Conditions #1 = < $200 Condition #2 = productivity ↑ %5 Condition #3 = injuries ↓ 33% Policy = 1∩(2U3) IE 327
Value Engineering Analysis Best IE 327
Cost Benefit Analysis IE 327
Crossover (Break-even) Analysis Wages = $9.60/hr or $0.16/min IE 327
Crossover (Break-even) Plot IE 327
Present and Install the New Method - 1 • Oral/written presentation • SELL the new method • Resistance to change • Hawthorne effect • Act of measuring something changes it • Human relations IE 327
Present and Install the New Method - 2 • Americans with Disabilities Act (ADA 1990) • Outlaws discrimination against disability • Substantially limits a major life activity • Employer must provide reasonable accommodation • Should not be undue hardship on employer • Follow-up (feedback) IE 327