1 / 20

Rehabilitation of the track formation layer with the RPM 2002 in Romania

Rehabilitation of the track formation layer with the RPM 2002 in Romania. Using high-output track formation rehabilitation machine. Rehabilitation of the track formation layer with the RPM 2002 in Romania. Rehabilitation of the track formation layer with the RPM 2002 in Romania.

macha
Download Presentation

Rehabilitation of the track formation layer with the RPM 2002 in Romania

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine

  2. Rehabilitation of the track formation layer with the RPM 2002 in Romania

  3. Rehabilitation of the track formation layer with the RPM 2002 in Romania Existing Situation: • the thickness of the ballast prism range between 0,40 – 1,10 m • formation protection layer range between 0,10 - 0,70 m • earth in the embankment is mainly mixed with clayey silts

  4. Rehabilitation of the track formation layer with the RPM 2002 in Romania Designed solution: • improve the plain line • improve the route geometry in longitudinal profile • improve the track geometry in cross-section • increasing the bearing capacity at the formation level

  5. Rehabilitation of the track formation layer with the RPM 2002 in Romania General work schedule: • Construction period 600 working days • 190 km of complete track renewal • laying of 310.000 new sleepers • installing of 20.000 tons of rails • laying of 150 new turnouts • laying of 600.000 m³ of new formation layers

  6. Rehabilitation of the track formation layer with the RPM 2002 in Romania Stations:

  7. Rehabilitation of the track formation layer with the RPM 2002 in Romania RPM 2002 track formation rehabilitation machine

  8. Rehabilitation of the track formation layer with the RPM 2002 in Romania Following works can be carried out in one operation process: • Excavation of the old ballast layer • Cleaning the ballast of cohesive material and metal pieces • Sharpening and cleaning the pre-cleaned ballast • Excavation of the remaining formation material • Levelling the sub grade • Building in the geotextile • Inserting and compaction of the formation layer • Inserting the recycled ballast • track tamping and recording the achieved track geometry

  9. Rehabilitation of the track formation layer with the RPM 2002 in Romania Ballast excavation chain:

  10. Rehabilitation of the track formation layer with the RPM 2002 in Romania Recycling equipment

  11. Rehabilitation of the track formation layer with the RPM 2002 in Romania Sub grade excavation chain

  12. Rehabilitation of the track formation layer with the RPM 2002 in Romania Formation layer insertion and compaction devices

  13. Rehabilitation of the track formation layer with the RPM 2002 in Romania Tamping unit

  14. Rehabilitation of the track formation layer with the RPM 2002 in Romania Quality Control

  15. Rehabilitation of the track formation layer with the RPM 2002 in Romania Quality Control Proctor

  16. Rehabilitation of the track formation layer with the RPM 2002 in Romania Inserting geo synthetic materials

  17. Rehabilitation of the track formation layer with the RPM 2002 in Romania Transport Logistics: Rail bonded transport with MFS spoil wagons

  18. Rehabilitation of the track formation layer with the RPM 2002 in Romania The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002: • Insertion of the new formation layer without removal of existing track • Recycling of old ballast • No movements on the substructure formation with machines • Compaction and levelling of substructure formation by RPM 2002

  19. Rehabilitation of the track formation layer with the RPM 2002 in Romania The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002: • Possibility of simultaneous insertion of geotextile and /or geogrid and formation layer • Performance of the machine from 40 up to 70 m/h, depending on the thickness of the track formation layer • On 2-tracks sections the train operation on the open track is possible • Short, open excavation pit (approx. 6m long and 1m deep)

  20. Rehabilitation of the track formation layer with the RPM 2002 in Romania The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002: • Saving up to 50% new material by mixing recycled material • Reducing the line closure time • No construction of temporary access roads • Assuring a hand back speed of 40 km/h on the rehabilitated track

More Related