900 likes | 1.07k Views
802.11 Mar 2010 Closing Plenary Reports. Authors:. Date: 2010-03-19. Abstract. This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2010 closing plenary meeting. 802.11 WG Editor’s Meeting (Mar ‘10). Authors:. Date: 2010-03-16.
E N D
802.11 Mar 2010 Closing Plenary Reports Authors: Date: 2010-03-19 Adrian Stephens, Intel Corporation
Abstract • This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2010 closing plenary meeting. Adrian Stephens, Intel Corporation
802.11 WG Editor’s Meeting (Mar ‘10) Authors: Date: 2010-03-16 Adrian Stephens, Intel Corporation from slide 1/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
Volunteer Editor Contacts • TGp – Wayne Fisher – wfisher@arinc.com • TGs – Kazuyuki Sakoda - KazuyukiA.Sakoda@jp.sony.com • TGu – Necati Canpolat – necati.canpolat@intel.com • TGv – Emily Qi – emily.h.qi@intel.com • TGz – Menzo Wentink– mwentink@qualcomm.com • TGmb – Adrian Stephens – adrian.p.stephens@intel.com (TBC) • TGaa – Hang Liu – hang.liu@thomson.net • Editor Emeritus: • TGk – Joe Kwak– joekwak@sbcglobal.net • TGn – Adrian Stephens – adrian.p.stephens@intel.com • TGr – Bill Marshall – wtm@research.att.com • TGw – Nancy Cam-Winget – ncamwing@cisco.com • TGy – Peter Ecclesine – pecclesi@cisco.com Adrian Stephens, Intel Corporation from slide 2/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
Two Technical Editors • Peter Ecclesine runs the face to face meetings • Adrian Stephens runs the publication process • Matthew Gast is the ANA administrator Adrian Stephens, Intel Corporation from slide 3/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers! Editor Amendment Ordering • Data as of Mar 2010 • See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm Adrian Stephens, Intel Corporation from slide 4/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
802.11 Style Guide • See 11-09-1034-00-0000-wg11-style-guide.doc • These style practices are to be followed when submitting drafts for Working Group consideration Adrian Stephens, Intel Corporation from slide 6/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
Pre-RevCom IEEE-SA Review • Possibly near the end of Sponsor Ballot (3rd recirc or 4th recirc) , we would offer the draft to the publications editor for review. This allows ambiguities and errors to be addressed in Sponsor Ballot by comments, rather than discover the ambiguities and errors after RevCom. • A downside is the possibility that many pages are touched by the changes (like renaming), and voters reopen text that has been stable for new comments. • It appears that during MEC is the least risky time for a publication editor’s review. • Another choice is after initial Sponsor Ballot. We will ask if it is valid to make editorial changes between EC approval and initial sponsor ballot. Adrian Stephens, Intel Corporation from slide 7/7 of 11-10/0321r3 by Peter Ecclesine (Cisco Systems)
Closing Report Authors: Date: 2010-03-19 Adrian Stephens, Intel Corporation from slide 1/3 of 11-10/0418r0 by Clint Chaplin, Chair (Samsung)
Abstract Closing report for WNG SC for March 2010, Orlando, Florida, USA Adrian Stephens, Intel Corporation from slide 2/3 of 11-10/0418r0 by Clint Chaplin, Chair (Samsung)
Five presentations at this meeting • Heterogeneous Wireless LAN Mesh Interworking (11-10-0296-01-0wng-heterogeneous-wireless-mesh-network-interworking.pptx) - Taejin Lee • Towards Carrier-Grade 802.11 at Disney Theme Parks (11-10-0287-03-0wng-towards-carrier-grade-802-11-at-disney-theme-parks.pptx) – Stefan Mangold • Comments on Sub 1 GHz license-exempt operation (11-10-0204-01-0wng-commentsonsub1ghz.ppt) – Dave Halasz • Fast Initial Authentication (11-10-0361-00-0000-fast-initial-authentication.ppt) - Hiroki Nakano • Heterogeneous Wireless Networks Management (11-10-0368-00-0wng-heterogeneous-wireless-networks-management.ppt) - 802.21 Network Management Study Group • Minutes • 11-10-364r0 • Plans for May 2010 • 2 2 hour sessions Adrian Stephens, Intel Corporation from slide 3/3 of 11-10/0418r0 by Clint Chaplin, Chair (Samsung)
IEEE 802.11 ARC SC – March 2010 Topics for March 802 Plenary 802.1 architecture document revision effort Impacts to .11 Interface approach Interested .11 Members .11 ARC Chair attended 802 OA session as .1 liaison .11 ARC did not meet this week Chair was off-line with food poisoning Stay away from the hotel café meatloaf special…. Adrian Stephens, Intel Corporation
802 OA project status • Revision of 802 OA is a currently authorized project • Par approved 27/feb/2007 • Expires end of 2011 • PAR was created for revision (instead of reaffirmation). • 802 Chair recently reorganized project • New project chair, 1 designated member from each “dot” group. • Status: • There is a d0 draft, it had a internal TG review in .1; • Review closed 2/2009, comments not processed. • 802 OA base doc is vintage 2001 for content • 2001 was rev of original 1990 doc • There are 2 amendments to 2001 doc • A (2003) for ethertypes & B (2004) Registration of object ids. Adrian Stephens, Intel Corporation
802 OA March 2010 Discussion Notes • Goals for project: • Update to reflect current usage • Insure it is relevant to all 802 groups. • Missing topics: • wireless, • .17, • should probably take out token ring and maybe FDDI. • Issue: we have stds that don’t have macs & phys (ex: 21 & 23) • how to fit them into this Framework? How does .19 fit? • AI for .11 (and other groups) review 802 OA, see how “dot” standard fits (or doesn’t) with layer pics in 802 OA, start discussion / proposal for 802 OA changes. Adrian Stephens, Intel Corporation
March 2010 TGmb Closing Report Authors: Date: 2010-03-18 Adrian Stephens, Intel Corporation from slide 1/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
Abstract Closing report for TGmb for March 2010 interim meeting in Orlando, Florida, USA. Adrian Stephens, Intel Corporation from slide 2/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
TGmb Status All aboard, full steam ahead on the recirculation! Photo credit: Tasa_M on Flickr; used with permission (Creative Commons license) http://www.flickr.com/photos/tasa_m/3274018735/ Adrian Stephens, Intel Corporation from slide 3/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
Accomplishments • No interpretation requests received • Completed comment processing from LB160; recirculation ballot will be requested later • One teleconference to resolve comments: May 7 • Major technical presentations • Clause 11.3 comment resolution • Extensive debate on key caching clarifications • Regulatory framework • No change to plan of record Adrian Stephens, Intel Corporation from slide 4/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
Current TGmb Plan of Record • May 2008 – Issue Call for Comment/Input • July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals • Sept 2008 – PAR revision process started • Nov 2008 – close receipt of new input • Nov 2008 – WG/EC approval of PAR Revision • Dec 2008 – NesCom/SASB approval PAR Revision • May 2009 – First WG Letter ballot • (includes All published Amendments as of May 2009) • Nov 2009 – Recirc start • May 2010 – Form Sponsor Pool (45 days) • July 2010 – Sponsor Ballot Start • (Include all published amendments as of July 2010) • November 2010 – Sponsor Recirc • March 2011 – WG/EC Final Approval • June 2011 – RevCom/SASB Approval Adrian Stephens, Intel Corporation from slide 5/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
References • Agenda: 11-10/0290r5 • Minutes: 11-10/0348r0 Adrian Stephens, Intel Corporation from slide 6/6 of 11-10/0346r0 by Matthew Gast, Trapeze Networks
TGp Closing Report Author: Date: 2010-03-17 Adrian Stephens, Intel Corporation from slide 1/4 of 11-10/0386r0 by Lee Armstrong (Armstrong Consulting, Inc ./US DoT
Abstract TGp (acting as P802.11p CRC) closing report for March meetings Adrian Stephens, Intel Corporation from slide 2/4 of 11-10/0386r0 by Lee Armstrong (Armstrong Consulting, Inc ./US DoT)
March Meetings Summary • Sponsor Ballot #1 closed on 16 February, 96 % affirmative • 3 time slots during the week • Completed resolution of all comments (21) prior to and during the week, resolution document is 11-10-0239-02-000p sb1 tgp comment resolutions master • All SB#1 commenters have indicated that they are satisfied with these resolutions • Voted to go to recirculation ballot as soon as possible • Voted to request EC for conditional approval to forward to June RevCom meeting Adrian Stephens, Intel Corporation from slide 3/4 of 11-10/0386r0 by Lee Armstrong (Armstrong Consulting, Inc ./US DoT)
Status • D11.0 will be going to recirculation ballot • All disapprove voters have been satisfied with one exception that did not vote on last ballot • Weekly teleconferences planned for every Thursday @ 1500 Piscataway time (resuming after recirculation ballot is complete) • Plan is to complete sponsor balloting and present to June RevCom meeting Adrian Stephens, Intel Corporation from slide 4/4 of 11-10/0386r0 by Lee Armstrong (Armstrong Consulting, Inc ./US DoT)
TGs Orlando Closing Report Author: Date: 2010-03-19 Adrian Stephens, Intel Corporation from slide 1/6 of 11-10/0421r0 by Dee Denteneer
Abstract TGs closing report for the March 2010meeting. Resolved outstanding comments and ready to go to recirculation. Adrian Stephens, Intel Corporation from slide 2/6 of 11-10/0421r0 by Dee Denteneer
Status • TGs passed LB 159 with 85% approval rate (January 2010) • Before the meeting: • Comment resolution spreadsheet 11-10/0032r5 with 349 comments open • Most recent TGs Draft is D4.01 • After meeting • Most recent TGs comment resolution spread sheet is 11-10/0032r11, with resolutions to all comments • An annotated agenda for TGs at this meeting in 11-10/0241r6 • The TGs draft minutes will be uploaded as 11-10/0381r1 Adrian Stephens, Intel Corporation from slide 3/6 of 11-10/0421r0 by Dee Denteneer
Next Steps • Produce Draft 5.0 and go to recirculation • TGs is holding teleconferences on Thursdays April 1 and May 6, 13 and Wednesday April 28 at 11:00 ET for a maximum duration of 90 minutes • TGs has planned an ad hoc meeting in Tokyo May 13-15 just before the May meeting in Beijing. • Goal for the May 2010 TGs meeting in Beijing, China: • Start resolving comments received in recirculation, aiming for a rapid recirculation Adrian Stephens, Intel Corporation from slide 4/6 of 11-10/0421r0 by Dee Denteneer
Motion: • Having approved comment resolutions for all of the comments received from LB#159 on P802.11s Draft 4.0 as contained in document 11-10/32r12, • Instruct the editor to prepare Draft 5.0 incorporating these resolutions and, • Approve a 15 day Working Group Recirculation Ballot asking the question “Should P802.11s Draft 5.0 be forwarded to Sponsor Ballot?” • Moved by Theodorus Denteneer on behalf of TGs • TGs vote: • Moved: Dave Halasz: Seconded: Michael Bahr Result: 10-0-0 Adrian Stephens, Intel Corporation from slide 5/6 of 11-10/0421r0 by Dee Denteneer
Motion, moved to schedule TGs teleconferences on Thursdays April 1 and May 6, 13 and Wednesday April 28 at 11:00 ET for a maximum duration of 90 minutes. • Mover: Kazuyuki Sakoda Seconder: Guido Hiertz • Approved by unanimous consent • Motion, moved to hold a TGs ad hoc on May 13-15 in Tokyo. • Mover: Guido Hiertz Seconder: Kazuyuki Sakoda • Approved by unanimous consent Adrian Stephens, Intel Corporation from slide 6/6 of 11-10/0421r0 by Dee Denteneer
Closing Report Authors: Date: 2010-03-18 Adrian Stephens, Intel Corporation from slide 1/3 of 11-10/0408r0 by Stephen McCann, RIM
Abstract Closing report for TGu Interworking with External Networks for March 2010, Orlando, Florida, USA Adrian Stephens, Intel Corporation from slide 2/3 of 11-10/0408r0 by Stephen McCann, RIM
Initial Sponsor Ballot (#0) progress • Resolved all comments this week. • 11-09-1120-20-000u-d8-0-comments-spreadsheet.xls • 1st re-circulation sponsor ballot late March 2010 • Teleconferences • Wednesdays at 11 ET • 31st March, 6th April, 28th April, 5th May, 12th May • Plans for May 2010 • Resolve 1st re-circ sponsor ballot comments Adrian Stephens, Intel Corporation from slide 3/3 of 11-10/0408r0 by Stephen McCann, RIM
March 2010 Closing Report Authors: Date: 2010-03-18 Adrian Stephens, Intel Corporation from slide 1/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
Abstract This document contains the TGv closing report for March 2010. Adrian Stephens, Intel Corporation from slide 2/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
Goals and Accomplishments • Comment resolution from Initial Sponsor Ballot • 1045 comments, 1045 resolutions completed, 0 remain • Teleconferences • Thursdays April 8, 15, 29, May 6, 13, Tuesday April 20 • 2pm Eastern (11am Pacific) • 2 hours Adrian Stephens, Intel Corporation from slide 3/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
Output Documents • 11-10-0416-00-000v-TGv-March-2010-closing-report.ppt • 11-10-0267-06-000v-tgv-March-2010-agenda.ppt • 11-10-0417-00-000v-TGv-Meeting-Minutes-March-2010.doc Adrian Stephens, Intel Corporation from slide 4/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
TGv Timeline – Updated Sept, 2009 • Initial Working Group Letter Ballot: July 07 – completed • Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 • Re-circulation Working Group Letter Ballot: November 08 (D4.0) • Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) • Form Sponsor Ballot Pool: August 09 • Initial Sponsor Ballot: Oct 09 • Oct 09 – D7.0 • Approved Sponsor Ballot: Nov 09 • Jan 09 – D8.0, March D9.0, April D10.0 (deleted Feb D9.0) • May 12th ( or so) for Revcom June Approval • Final WG/EC Approval: July 2010 • RevCom/Standards Board Approval: June 4th/June 5th(or so) • Note: TGv PAR is authorized through Dec 2010 Adrian Stephens, Intel Corporation from slide 5/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
TGv Timeline – Updated March, 2010 • Initial Working Group Letter Ballot: July 07 – completed • Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 • Re-circulation Working Group Letter Ballot: November 08 (D4.0) • Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) • Form Sponsor Ballot Pool: August 09 • Initial Sponsor Ballot: Oct 09 • Oct 09 – D7.0 Approved Sponsor Ballot: Nov 09 • Jan 09 – D8.0, D9.0, March D10.0, April/May D11.0, May/June D11.0 (unchanged) • 20 August Revcom for Sept approval (was May/ June) • Final WG/EC Approval: July 2010 • RevCom/Standards Board Approval: September 2010 (was June 2010) • Note: TGv PAR is authorized through Dec 2010 Adrian Stephens, Intel Corporation from slide 6/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
Goals for Mar 10 - May 2010 • Second Recirculation Sponsor Ballot • Resolve comments from Second Recirculation Sponsor Ballot • Third Recirculation Sponsor Ballot Adrian Stephens, Intel Corporation from slide 7/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
References Adrian Stephens, Intel Corporation from slide 8/8 of 11-10/0416r0 by Dorothy Stanley (Aruba Networks)
TGz Orlando Closing Report Authors: Date: 18 March 2010 Adrian Stephens, Intel Corporation from slide 1/2 of 11-10/0400r0 by Menzo Wentink (Qualcomm)
TGz Accomplishments in Orlando • TGz resolved all of the comments received on the first recirculation sponsor ballot • The approved comment resolutions are in 11-10/298r2 • TGz approved a 15-day recirculation sponsor ballot to start when the editor has prepared TGz draft 8.0 • TGz approved the following teleconferences: • April 8, 15, 22, 29, May 6, 13 • Start time 2pm ET, for 2 hours Adrian Stephens, Intel Corporation
802.11aa – Robust Audio Video Transport Streaming Orlando, FloridaClosing Report – Draft Version Date: 2010-03-18 Authors: Adrian Stephens, Intel Corporation from slide 1/5 of 11-10/0395r0 by Ganesh Venkatesan, Intel; Alex Ashley, NDS
Snapshot • Goals for the Orlando Meeting: • Review alternate proposals on interworking with 802.1Qat proposal and adopt the best fit • Discuss and resolve review comments on Draft 0.04 • Listen to technical proposals on TGaa topics • Joint meeting with 802.1AVB – review 802.1Qat and settle on a proposal for“interworking with 802,1Qat” • Empower the editor to generate D0.99 for internal review WG letter ballot at the end of May meeting Adrian Stephens, Intel Corporation
Technical Presentations Adrian Stephens, Intel Corporation
What did we accomplish this week? • Discussed, resolved and approved corresponding contributions related to comments on Draft 0.02, D0.03 • Listened to technical proposals on TGaa topics • Jointly met with 802.1AVB • Reviewed alternate solutions on interworking with 802.1Qat proposal. • Selected an approach for 802.11 interworking with 802.1Qat MSR protocol • Empowered the editor to generate D0.05 incorporating approved internal review comment resolutions/new contributions. Adrian Stephens, Intel Corporation
Plans • Teleconferences (Mar 29, Apr 12, Apr 26, May 10 – 1100-1230 Hrs EDT) • Complete internal review of Draft 0.04, resolve corresponding comments • Listen to technical proposals on TGaa topics • Complete Draft 0.05 review and generate comment spreadsheet • May 2010 Meeting • Complete Draft 0.05 comment resolution • Approve Draft1.0 and kickoff WG letter Ballot Adrian Stephens, Intel Corporation
TGac March 2010 Closing Report Authors: Date: 2010-03-18 Adrian Stephens, Intel Corporation from slide 1/6 of 11-10/0413r0 by Osama Aboul-Magd (Samsung)
Abstract This document is the closing report for the TGac for the March 2010 session. Adrian Stephens, Intel Corporation from slide 2/6 of 11-10/0413r0 by Osama Aboul-Magd (Samsung)