1 / 8

(Two) ROCs experiences

(Two) ROCs experiences. Diana.Bosio@cern.ch. ROC RFC… . E-mail on June 5 to the ROC managers list asking for CCRC’08 feedback No replies Another e-mail on June 10, with 5 yes/no questions Are you aware of the May CCRC’08? Did you notice it? Are you aware of the elogger? Did you read it?

mada
Download Presentation

(Two) ROCs experiences

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (Two) ROCs experiences Diana.Bosio@cern.ch

  2. ROC RFC… • E-mail on June 5 to the ROC managers list asking for CCRC’08 feedback • No replies • Another e-mail on June 10, with 5 yes/no questions • Are you aware of the May CCRC’08? • Did you notice it? • Are you aware of the elogger? • Did you read it? • How often? Daily? Weekly? • ☻ Two answers (well, actually one: APROC) • So feedback is based on APROC and CERN ROC experience WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  3. ROC experiences • Only 2 out of 11 ROCs feel directly concerned by the CCRC’08 enough to give feedback • WHY?? • ¿ Is it that they are all happy with the status quo? • ¿ Or that CCRC’08 is perceived to be an LCG-to-site business and ROCs act merely as watchers, if at all? • Based on the fact that the 2 ROCs that answered have strong connections with T1 sites. • Of course, I could be mistaken… • Main difference perceived at site level (mw upgrades, experiments requirements at sites) • No real difference in terms of support at ROC level WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  4. ROC conCERNs • We would not like the ROCs “to get in the way” • But we want to be kept in the loop… • … without having to look in many different places to be aware of what is going on (wiki, elogger, OPS meeting, GGUS…) • We would like issues to be traceable and searchable so that knowledge can be built around those • Clear procedure to contact site during and outside of office hours if needed • EASIER SAID THAN DONE! • General concern, not just for the CCRC. WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  5. During office hours • GGUS tickets rather than elogger • “VO shifters”/ “the team” tickets could do the job for issues raised by VOs (available as of June 2008). • will bypass the ROC to go straight to the site • ROC remains in the loop • Yes, but: How to distinguish those from the other tickets if required?? • Specific short description as the COD tickets ? • A specific string added to the short description? • A new field to be propagated to the local ticketing system? WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  6. Out of office hours • APROC solved brilliantly: people at CERN and in Taipei! • But for the others: how to make sure that site operators working out of hours shifts • are grid aware? • Site operators are familiar only with the way the site operates and the services as run by the site • AFS -> UI • Remedy -> ROC CERN user support • LSF -> CE and WNs • are able to send a broadcast? • Typically do not have a grid certificate • are able to have a phone conversation in English? • A phone conversation is the most difficult thing for a non native speaker! • Imagine if you have to have it while the other person is worried, in a hurry, if not in panic! WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  7. The broadcast call (USA) •  ring, ring • “Hello, John speaking” • “’ello, zere iz a bombe in the computer rhume au SERN” • “A what?” (louder) • “’ello, zere iz a bombe in the computer rhume au SERN. Ze grid is down, plis zend eu brotcaste” • “Hello? The grid? You mean OSG? The power grid?” • USA operator hangs down after several minutes of this conversation, confused. No broadcast is sent. WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

  8. The broadcast call (Taipei) •  ring, ring • “喂?” (“Wei?”) • “ello, zere iz a pover coot au SERN” • “SELN pouel cat?” • “no, pover coot au SERN: ze elefess end ze aheffess iz done. ze Globale elleffsay is up, but Physics zervices ‘ave been done for too ours. Plis zend oh broddcaste” • “vely well, bloadcast, 再見” (“Joi Gin”) BROADCAST SENT: SELN had a power cat and physics LFC services are down four hours. WLCG CCRC'08 Post-Mortem Workshop, 12-13 June 2008

More Related