An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMPACT 200 RAPID REACTION BRIDGE SYSTEM

  2. COMPACT 200 RAPID REACTION BRIDGE SYSTEM The design of the Mabey Compact 200 bridge allows the system to be used in a logistic role throughout the support area. As a Line of Communication bridge it can carry loads of up to Class 110 over gaps of up to 60m (200ft). The bridge is ideally suited for areas where speed of deployment is vital.

  3. Rapid Construction The bridge is designed to be built by hand. A 30m bridge can be assembled and conventionally launched by 29 men in two or three hours, depending on site conditions. Where cranes or materials handling equipment is available, the total number of man hours to assemble a bridge is substantially reduced.

  4. Launching Nose Load Testing

  5. B Co, 23rd Engr Bn replacing the Brcko Bridge with the Compact 200 (MAR 96)

  6. Based on the launch and erection of a 130ft (39.62m) clear span, single lane bridge.

  7. Based on the launch and erection of a 130ft (39.62m) clear span, single lane bridge to carry MLC80 (T). Note, the M2 Bailey is unable to accommodate MLC 96 (W) Traffic.